Back
 AJIBM  Vol.10 No.1 , January 2020
Optimization of Ore Production in Copper Mine
Abstract: Mining activities are risky operations and represent a significant threat to capital investments. These activities, which require many years of evaluating the technical characteristics of the mineral deposit using the most appropriate method, also require an economic, safety, environmental or other evaluation. In this study, a feasibility study of copper production is proposed to determine the optimal production scale based on three production plans. The mining production scale is based on 4.5 million t/a compared to other projects on the change in quantity, investment and engineering cost when the mining production scale is reduced to 3.5 million t/a and increased to 5.5 million t/a. The results reveal that applying 4.5 million t/a to the mining production project appears to be the optimal choice in terms of economic benefits, both after verification of the production scale in terms of annual decline rate and reasonable mine life. The result also shows that the production scale of 4.5 million t/a is technically more feasible.
Cite this paper: Nyandwe, E. , Zhang, Q. and Wang, D. (2020) Optimization of Ore Production in Copper Mine. American Journal of Industrial and Business Management, 10, 61-74. doi: 10.4236/ajibm.2020.101005.
References

[1]   Kendrick, T. (2015) Identifying and Managing Project Risk: Essential Tools for Failure-Proofing Your Project. Amacom.

[2]   Bak, M., Borkowski, P. and Pawlowska, B. (2012) Types of Solutions Improving Passenger Transport Interconnectivity. Transport Problems, 7, 27-36.

[3]   Banerjee, A. (2000) Linkage between Economic Value Added and Market Value: An Analysis. Vikalpa, 25, 23-36.
https://doi.org/10.1177/0256090920000304

[4]   Rodovalho, E.D.C. and Cabral, I.E. (2014) Estimate of Hourly Productivity Applied to Elaboration and Implementation of Mining Plans. Rem: Revista Escola de Minas, 67, 221-227.
https://doi.org/10.1590/S0370-44672014000200015

[5]   Miao, X.X., Zhang, J.X. and Guo, G.L. (2010) Study on Waste-Filling Method and Technology in Fully-Mechanized Coal Mining. Journal of China Coal Society, 35, 1-6.

[6]   Mackenzie, W. and Cusworth, N. (2007) The Use and Abuse of Feasibility Studies. AusIMM Project Evaluation Conference, Australasian Institute of Mining and Metallurgy, Melbourne, Australia.

[7]   Liu, S., Wang, G.S. and Chen, Q.S. (2010) The Prediction of the Demand and Supply of Copper in China. China Mining Magazine, 8.

[8]   Karwowska, E., Wojtkowska, M. and Andrzejewska, D. (2015) The Influence of Metal Speciation in Combustion Waste on the Efficiency of Cu, Pb, Zn, Cd, Ni and Cr Bioleaching in a Mixed Culture of Sulfur-Oxidizing and Biosurfactant-Producing Bacteria. Journal of Hazardous Materials, 299, 35-41.
https://doi.org/10.1016/j.jhazmat.2015.06.006

[9]   Brininstool, M. (2019) Remaining Mines were Either Small Leach Operations or Product Producers of Copper. Global Mine Production Increased by about 8% to 18.3 Mt. Minerals Yearbook: Metals and Minerals.

[10]   Li, L., Pan, D.A., Li, B., Wu, Y., Wang, H., Gu, Y. and Zuo, T. (2017) Patterns and Challenges in the Copper Industry in China. Resources, Conservation and Recycling, 127, 1-7.
https://doi.org/10.1016/j.resconrec.2017.07.046

[11]   Wang, J. (2004) Prospects of Exploration and Development of Copper Resources in China. Scientific and Technological Management of Land and Resources, 21, 27-30.

[12]   Siebert, U. (2003) When Should Decision-Analytic Modeling Be Used in the Economic Evaluation of Health Care? The European Journal of Health Economics, 4, 143-150.
https://doi.org/10.1007/s10198-003-0205-2

[13]   Sculpher, M.J., Claxton, K., Drummond, M. and McCabe, C. (2006) Whither Trial-Based Economic Evaluation for Health Care Decision Making? Health Economics, 15, 677-687.
https://doi.org/10.1002/hec.1093

[14]   Wiest, J.D. (1964) Some Properties of Schedules for Large Projects with Limited Resources. Operations Research, 12, 395-418.
https://doi.org/10.1287/opre.12.3.395

[15]   Posnett, J. and Jan, S. (1996) Indirect Cost in Economic Evaluation: The Opportunity Cost of Unpaid Inputs. Health Economics, 5, 13-23.
https://doi.org/10.1002/(SICI)1099-1050(199601)5:1<13::AID-HEC182>3.0.CO;2-J

[16]   Cord, J. (1964) A Method for Allocating Funds to Investment Projects When Returns Are Subject to Uncertainty. Management Science, 10, 335-341.
https://doi.org/10.1287/mnsc.10.2.335

[17]   Heuberger, R. (2005) Risk Analysis in the Mining Industry. Journal of the Southern African Institute of Mining and Metallurgy, 105, 75-79.

[18]   Campbell, J.A. (2002) Real Options Analysis of the Timing of IS Investment Decisions. Information & Management, 39, 337-344.
https://doi.org/10.1016/S0378-7206(01)00101-X

 
 
Top