[1] Kendrick, T. (2015) Identifying and Managing Project Risk: Essential Tools for Failure-Proofing Your Project. Amacom.
[2] Bak, M., Borkowski, P. and Pawlowska, B. (2012) Types of Solutions Improving Passenger Transport Interconnectivity. Transport Problems, 7, 27-36.
[3] Banerjee, A. (2000) Linkage between Economic Value Added and Market Value: An Analysis. Vikalpa, 25, 23-36.
https://doi.org/10.1177/0256090920000304
[4] Rodovalho, E.D.C. and Cabral, I.E. (2014) Estimate of Hourly Productivity Applied to Elaboration and Implementation of Mining Plans. Rem: Revista Escola de Minas, 67, 221-227.
https://doi.org/10.1590/S0370-44672014000200015
[5] Miao, X.X., Zhang, J.X. and Guo, G.L. (2010) Study on Waste-Filling Method and Technology in Fully-Mechanized Coal Mining. Journal of China Coal Society, 35, 1-6.
[6] Mackenzie, W. and Cusworth, N. (2007) The Use and Abuse of Feasibility Studies. AusIMM Project Evaluation Conference, Australasian Institute of Mining and Metallurgy, Melbourne, Australia.
[7] Liu, S., Wang, G.S. and Chen, Q.S. (2010) The Prediction of the Demand and Supply of Copper in China. China Mining Magazine, 8.
[8] Karwowska, E., Wojtkowska, M. and Andrzejewska, D. (2015) The Influence of Metal Speciation in Combustion Waste on the Efficiency of Cu, Pb, Zn, Cd, Ni and Cr Bioleaching in a Mixed Culture of Sulfur-Oxidizing and Biosurfactant-Producing Bacteria. Journal of Hazardous Materials, 299, 35-41.
https://doi.org/10.1016/j.jhazmat.2015.06.006
[9] Brininstool, M. (2019) Remaining Mines were Either Small Leach Operations or Product Producers of Copper. Global Mine Production Increased by about 8% to 18.3 Mt. Minerals Yearbook: Metals and Minerals.
[10] Li, L., Pan, D.A., Li, B., Wu, Y., Wang, H., Gu, Y. and Zuo, T. (2017) Patterns and Challenges in the Copper Industry in China. Resources, Conservation and Recycling, 127, 1-7.
https://doi.org/10.1016/j.resconrec.2017.07.046
[11] Wang, J. (2004) Prospects of Exploration and Development of Copper Resources in China. Scientific and Technological Management of Land and Resources, 21, 27-30.
[12] Siebert, U. (2003) When Should Decision-Analytic Modeling Be Used in the Economic Evaluation of Health Care? The European Journal of Health Economics, 4, 143-150.
https://doi.org/10.1007/s10198-003-0205-2
[13] Sculpher, M.J., Claxton, K., Drummond, M. and McCabe, C. (2006) Whither Trial-Based Economic Evaluation for Health Care Decision Making? Health Economics, 15, 677-687.
https://doi.org/10.1002/hec.1093
[14] Wiest, J.D. (1964) Some Properties of Schedules for Large Projects with Limited Resources. Operations Research, 12, 395-418.
https://doi.org/10.1287/opre.12.3.395
[15] Posnett, J. and Jan, S. (1996) Indirect Cost in Economic Evaluation: The Opportunity Cost of Unpaid Inputs. Health Economics, 5, 13-23.
https://doi.org/10.1002/(SICI)1099-1050(199601)5:1<13::AID-HEC182>3.0.CO;2-J
[16] Cord, J. (1964) A Method for Allocating Funds to Investment Projects When Returns Are Subject to Uncertainty. Management Science, 10, 335-341.
https://doi.org/10.1287/mnsc.10.2.335
[17] Heuberger, R. (2005) Risk Analysis in the Mining Industry. Journal of the Southern African Institute of Mining and Metallurgy, 105, 75-79.
[18] Campbell, J.A. (2002) Real Options Analysis of the Timing of IS Investment Decisions. Information & Management, 39, 337-344.
https://doi.org/10.1016/S0378-7206(01)00101-X