Back
 AJIBM  Vol.10 No.1 , January 2020
Work Line Balancing and Production Efficiency of Manufacturing Firms in Rivers State, Nigeria
Abstract: Manufacturing firms are faced with the sequencing of tasks in workstations as the capabilities of manufacturing firms is to harness resources through the effective sequencing of task assignments in workstations. Thus, this study empirically examined work line balancing and production efficiency of manufacturing firms in Rivers State, Nigeria. Content on improving production efficiency by reducing non-value-added activities, cycle time and distribution of workload at each work station by work line balancing process, was also addressed. The dimensions of work line balancing were standardized work and one-piece flow; while production efficiency was measured using product output, product quality, and lead time reduction. The Pearson’s Product Moment Correlation Coefficient (PPMCC) was used to test the significance of the relationship between dimensions of work line balancing and production efficiency. The findings showed that standard work procedures in work stations’ task assignments provide better work line balance and show a positive significant relationship with product output and lead time reduction. Also, one-piece flow was revealed to have a more significant and positive relationship with product quality than product output and lead time reduction. Therefore, it was concluded that implementing appropriate work line balancing in the workstations should be an ongoing activity in the production process and setting capacity utilization baselines is key to improving production efficiency.
Cite this paper: Bagshaw, K. (2020) Work Line Balancing and Production Efficiency of Manufacturing Firms in Rivers State, Nigeria. American Journal of Industrial and Business Management, 10, 45-60. doi: 10.4236/ajibm.2020.101004.
References

[1]   Chase, R. and Aquilano, N. (1985) Production and Operations Management. 4th Edition, Irwin, Homewood, 470-483, 533.

[2]   Davies, R.C., Medbo, L., Engström, T. and Akselsson, R. (1999) Work and Work Place Design Using Empirical Shop Floor Information and Virtual Reality Techniques.
http://www.ie.lth.se/IE/Roy/papers/IEA97/WorkplaceDesign.html

[3]   Bagshaw, K.B. (2014) Assessing the Application of Production Scheduling; Demand Uncertainty and Performance of Manufacturing Firms in Rivers State, Nigeria. Journal of International Review of Management and Business Research, 3, 38-54.

[4]   Amen (2000) An Exact Method for Cost Oriented Assembly Line Balancing. International Journal of Production Economics, 64, 187-195.
https://doi.org/10.1016/S0925-5273(99)00057-2

[5]   Zielinski, J. and Czacherska, M. (2009) A Multiple-Rule Heuristic for Work Line Balancing. Journal of the Operational Research Society, 46, 62-69.
https://doi.org/10.1057/jors.1995.7

[6]   Becker, C. and Scholl, A. (2006) A Survey on Problems and Methods in Generalized Assembly Line Balancing. European Journal of Operational Research, 168, 694-715.
https://doi.org/10.1016/j.ejor.2004.07.023

[7]   Sane, S., Karandikar, V., Pulkurte, R. and Patil, S. (2014) Assembly Line Balancing: A Case Study in Silencer Manufacturing. International Journal of Current Engineering and Technology, 4, 15832-15336.

[8]   Falkenauer, E. (2009) Branch-and-Bound Algorithms for the Multi-Product Assembly Line Balancing Problem. European Journal of Operations Research, 58, 215-222.
https://doi.org/10.1016/0377-2217(92)90208-Q

[9]   Bhattacharjee, T.K. and Sahu, S. (1988) A Heuristic Approach to General Assembly Line Balancing. International Journal of Operations and Production Management, 8, 67-77.
https://doi.org/10.1108/eb054843

[10]   Liu, C.M. and Chen, C.H. (2002) Multi-Section Electronic Assembly Line Balancing Problems: A Case Study. International Journal of Product Planning and Control, 12, 452-461.
https://doi.org/10.1080/09537280210142781

[11]   Das, B., Sanchez-Rivas, J., Garcia-Diaz, A. and. MacDonald, C. (2010) A Computer Simulation Approach to Evaluating Assembly Line Balancing with Variable Operation Times. Journal of Manufacturing Technology Management, 21, 872-887.
https://doi.org/10.1108/17410381011077964

[12]   Ongkunaruk and Wongsatit (2014) Multi-Objective Design of Team-Oriented Work Line Balancing. European Journal of Operational Research, 156, 326-352.
https://doi.org/10.1016/S0377-2217(03)00054-7

[13]   Boyer, D. (2008) A Weighted Approach for Work Line Balancing Design with Station Paralleling and Equipment Selection. IIE Transactions, 35, 73-85.
https://doi.org/10.1080/07408170304429

[14]   Kasul, R.A. and Motwani, J.G. (1997) Successful Implementation of TPS in a Manufacturing Setting: A Case Study. Industrial Management and Data Systems, 97, 274-279.
https://doi.org/10.1108/02635579710191707

[15]   Askin, R.G. and Goldberg, J.B. (2010) A Branch-and-Bound Based Solution Approach for the Mixed-Model Work Line-Balancing Problem for Minimizing Stations and Task Duplication Costs. European Journal of Operational Research, 34, 2010-2024.

[16]   Harper, S.C. and Porter, T.W. (2011) The Elusive Next Level. Institute of Industrial Engineers, September/October, 18-23.

[17]   Bresnahan, T. (2010) General Purpose Technologies. In: Handbook of the Economics of Innovation, Elsevier, Amsterdam, Vol. 2, 761-791.
https://doi.org/10.1016/S0169-7218(10)02002-2

[18]   Parasuraman, A., Zeithaml, V.A. and Berry, L.L. (1985) Scales for Measuring Service Quality: A Comparatives Assessment Based on Psychometric and Diagnostic Criteria. Journal of Retailing, 70, 201-230.
https://doi.org/10.1016/0022-4359(94)90033-7

[19]   Zeithaml, V.A. (1988) Consumer Perceptions of Price, Quality and Value: A Means-End Model and Synthesis of Evidence. Journal of Marketing, 52, 2-22.
https://doi.org/10.1177/002224298805200302

[20]   Nenadál, J. (2002) Moderní systémy řízeníjakosti: Quality Management. 2nd Edition, Management Press, Praha. (In Czech)

[21]   Garvin, D. (2007) Managing Quality: The Strategic and Competitive Edge. Free Press, New York.

[22]   Gershwin, S. (2000) Design and Operation of Manufacturing Systems: The Control-Point Policy. IIE Transactions, 32, 891-906.
https://doi.org/10.1080/07408170008967448

[23]   Bagshaw, K.B. (2015) Lead Time Uncertainties, Average Inventory and Scheduling Practice on Manufacturing Firms in Nigeria. International Review of Management and Business Research, 4, 1118-1132.

[24]   Nielsen, P., Michna, Z. and Do, N.A.D. (2014) An Empirical Investigation of Lead Time Distributions. In: Grabot, B., Vallespir, B., Gomes, S., Bouras, A. and Kiritsis, D., Eds., IFIP International Conference on Advances in Production Management Systems, Springer, Berlin, 435-442.

[25]   Harrington, S.J. (1996) The Effect of Codes of Ethics and Personal Denial of Responsibility on Computer Abuse Judgments and Intentions. MIS Quarterly, 20, 257-278.
https://doi.org/10.2307/249656

[26]   Sarantakos, S. (2005) Social Research. 3rd Edition, Macmillan Education, Melbourne.
https://doi.org/10.1007/978-0-230-20901-5

[27]   Zupan, H. and Herakovic, N. (2015) Production Line Balancing with Discrete Event Simulation: A case Study. IFAC (International Federation of Automatic Control) IFAC-Papers Online, 48, 2305-2311.
https://doi.org/10.1016/j.ifacol.2015.06.431

[28]   Jackson, S.E. and Schuler, R.S. (1985) A Meta-Analysis and Conceptual Critique of Research on Role Ambiguity and Role Conflict in Work Settings. Organizational Behavior and Human Decision Processes, 36, 16-78.
https://doi.org/10.1016/0749-5978(85)90020-2

[29]   Emiliani, M.L. (2008) Standardized Work for Executive Leadership. Leadership and Organization Development Journal, 29, 24-46.
https://doi.org/10.1108/01437730810845289

[30]   Galinsky, E., Bond, J.T., Kim, S.S., Backon, L., Brownfield, E. and Sakai, K. (2005) Overwork in America: When the Way We Work Becomes Too Much. Families and Work Institute, New York.

[31]   Bagshaw, K.B. (2018) Lean Application and Efficiency of Manufacturing Firms: An Empirical Study of Manufacturing Firms in Rivers State, Nigeria. International Journal of Management Excellence, 11, 1553-1558.
https://doi.org/10.17722/ijme.v11i2.466

[32]   George, J.M. and Zhou, J. (2002) Understanding When Bad Moods Foster Creativity and Good Ones Don’t: The Role of Context and Clarity of Feelings. Journal of Applied Psychology, 87, 687-697.
https://doi.org/10.1037/0021-9010.87.4.687

[33]   Löfgren, M. and Witell, L. (2008) Two Decades of Using Kano’s Theory of Attractive Quality: A Literature Review. The Quality Management Journal, 15, 59-75.
https://doi.org/10.1080/10686967.2008.11918056

[34]   Seto-Pamies, D. (2012) Customer Loyalty to Service Providers: Examining the Role of Service Quality, Customer Satisfaction and Trust. Total Quality Management, 23, 1257-1271.
https://doi.org/10.1080/14783363.2012.669551

[35]   Kuhlang, P., Edtmayr, T. and Sihn, W. (2011) Methodical Approach to Increase Productivity and Reduces Lead Time in Assembly and Production-Logistic Processes. CIRP Journal of Manufacturing Science and Technology, 4, 24-32.
https://doi.org/10.1016/j.cirpj.2011.02.001

[36]   Tang, Y.-T. and Chang, C.-H. (2010) Impact of Role Ambiguity and Role Conflict on Employee Creativity. African Journal of Business Management, 4, 869-881.

 
 
Top