[1] Chen, C. and Doloi, H. (2008) BOT Application in China: Driving and Impeding Factors. International Journal of Project Management, 26, 388-398.
https://doi.org/10.1016/j.ijproman.2007.07.002
[2] Almarri, K. (2016) Improving PPP Contract Design for Procurement of Public Projects. The 10th International Conference on Project Management, Gold Coast, Australia, November 2016, 19-27.
[3] Ng, S.T., Xie, J., Cheung, Y.K. and Jefferies, M. (2007) A Simulation Model for Optimizing the Concession Period of Public-Private Partnerships Schemes. International Journal of Project Management, 25, 791-798. https://doi.org/10.1016/j.ijproman.2007.05.004
[4] Cheng, Z., Ke, Y., Lin, J., Yang, Z. and Cai, J. (2016) Spatio-Temporal Dynamics of Public Private Partnership Projects in China. International Journal of Project Management, 34, 1242-1251. https://doi.org/10.1016/j.ijproman.2016.05.006
[5] Zhang, X. (2005) Financial Viability Analysis and Capital Structure Optimization in Privatized Public Infrastructure Projects. Journal of Construction Engineering & Management, 131, 656-668. https://doi.org/10.1061/(asce)0733-9364(2005)131:6(656)
[6] Song, H. and Gao, X. (2018) Green Supply Chain Game Model and Analysis under Revenue-Sharing Contract. Journal of Cleaner Production, 170, 183-192.
https://doi.org/10.1016/j.jclepro.2017.09.138
[7] Almarri, K. and Blackwell, P. (2014) Improving Risk Sharing and Investment Appraisal for PPP Procurement Success in Large Green Projects. Procedia-Social and Behavioral Sciences, 119, 847-856. https://doi.org/10.1016/j.jclepro.2017.09.138
[8] Shan, X.Q. and Ye, X.S. (2012) Research on Public-Private Financing Mode of Public Rental Housing and Its Selection. 2012 International Conference on Management Science & Engineering 19th Annual Conference Proceedings, Dallas, TX, 20-22 September 2012, 1787-1793.
https://doi.org/10.1109/icmse.2012.6414414
[9] Kang, C.C., Feng, C.M. and Kuo, C.Y. (2011) A Royalty Negotiation Model for BOT (Build-Operate-Transfer) Projects: The Operational Revenue-Based Model. Mathematical & Computer Modelling, 54, 2338-2347. https://doi.org/10.1016/j.mcm.2011.05.042
[10] Wang, Y. and Liu, J. (2015) Evaluation of the Excess Revenue Sharing Ratio in PPP Projects Using Principal-Agent Models. International Journal of Project Management, 33, 1317-1324.
https://doi.org/10.1016/j.ijproman.2015.03.002
[11] Abhishek, V., Hajek, B. and Williams, S.R. (2013) Auctions with a Profit Sharing Contract. Games & Economic Behavior, 77, 247-270. https://doi.org/10.1016/j.geb.2012.10.007
[12] Ortiz, I.N. and Buxbaum, J.N. (2008) Protecting the Public Interest in Long-Term Concession Agreements for Transportation Infrastructure. Public Works Management & Policy, 13, 126-137.
https://doi.org/10.1177/1087724x08326175
[13] Song, J., Jin, L., Zhao, Y. and Hu, W. (2017) Using Bargaining-Game Model to Negotiate Compensation for the Early Termination of BOT Highway Projects. Transportation Research Part: A Policy & Practice, 105, 197-209. https://doi.org/10.1177/1087724x08326175
[14] Qian, G.X., Zhang, Y.P., Jian-Guo, W.U. and Pan, Y.H. (2013) Revenue Sharing in Dairy Industry Supply Chain—A Case Study of Hohhot, China. Journal of Integrative Agriculture, 12, 2300-2309. https://doi.org/10.1016/s2095-3119(13)60585-7
[15] Iossa, E. and Martimort, D. (2015) The Simple Microeconomics of Public-Private Partnerships. Journal of Public Economic Theory, 17, 4-48. https://doi.org/10.1111/jpet.12114
[16] Sérgiodomingues, Dejanzlatkovic and Athenaroumboutsos (2014) Contractual Flexibility in Transport Infrastructure PPP. European Transport Conference 2014, Frankfurt, October 2014, 1-19.
[17] Iseki, H. and Houtman, R. (2012) Evaluation of Progress in Contractual Terms: Two Case Studies of Recent DBFO PPP Projects in North America. Research in Transportation Economics, 36, 73-84. https://doi.org/10.1016/j.retrec.2012.03.004
[18] Zhang, X. (2005) Critical Success Factors for Public-Private Partnerships in Infrastructure Development. Journal of Construction Engineering & Management, 131, 3-14.
[19] Liu, J., Gao, R., Cheah, C.Y.J. and Luo, J. (2016) Incentive Mechanism for Inhibiting Investors’ Opportunistic Behavior in PPP Projects. International Journal of Project Management, 34, 1102-1111. https://doi.org/10.1016/j.ijproman.2016.05.013
[20] Cotula, L. (2010) Investment Contracts and Sustainable Development: How to Make Contracts for Fairer and More Sustainable Natural Resource Investments. International Institute for Environment and Development, London.
[21] Shen, L.Y., Bao, H.J., Wu, Y.Z. and Lu, W.S. (2007) Using Bargaining-Game Theory for Negotiating Concession Period for BOT-Type Contract. Journal of Construction Engineering & Management, 133, 385-392. https://doi.org/10.1061/(asce)0733-9364(2007)133:5(385)
[22] Kang, C.C., Feng, C.M. and Huang, S.C. (2007) A New Financial Engineering Model for Analyzing the Royalty of BOT Projects: The Taiwan Case. IEEE International Conference on Industrial Engineering and Engineering Management, Singapore, 2-4 December 2007, 277-281.
https://doi.org/10.1109/ieem.2007.4419195
[23] Ke, Y., Wang, S.Q., Chan, A.P.C. and Lam, P.T.I. (2010) Preferred Risk Allocation in China’s Public-Private Partnership (PPP) Projects. International Journal of Project Management, 28, 482-492. https://doi.org/10.1016/j.ijproman.2009.08.007
[24] Schepper, S.D., Dooms, M. and Haezendonck, E. (2014) Stakeholder Dynamics and Responsibilities in Public-Private Partnerships: A Mixed Experience. International Journal of Project Management, 32, 1210-1222. https://doi.org/10.1016/j.ijproman.2014.01.006
[25] Cheung, S.N.S. (1969) The Theory of Share Tenancy: With Special Application to Asian Agriculture and the First Phase of Taiwan Land Reform. The University of Chicago Press, Chicago and London, 3-4, 85-87.
[26] Cheung, S.N.S. (2014) The Choice of Institutional Arrangements (Economic Explanation, Book Four). China Citic Press, Beijing.
[27] Cheung, S.N.S. (1969) The Theory of Share Tenancy: With Special Application to Asian Agriculture and the First Phase of Taiwan Land Reform. The University of Chicago Press, Chicago and London, 3-4, 85-87, 84.
[28] Shen, L.Y., Li, H. and Li, Q.M. (2002) Alternative Concession Model for Build Operate Transfer Contract Projects. Journal of Construction Engineering and Management, 128, 326-330. https://doi.org/10.1061/(asce)0733-9364(2002)128:4(326)
[29] Hanaoka, S. and Palapus, H.P. (2012) Reasonable Concession Period for Build-Operate-Transfer Road Projects in the Philippines. International Journal of Project Management, 30, 938-949.
https://doi.org/10.1016/j.ijproman.2012.02.001
[30] Engel, E.M.R.A., Fischer, R.D. and Galetovic, A. (2001) Least-Present-Value-of-Revenue Auctions and Highway Franchising. Journal of Political Economy, 109, 993-1020.
https://doi.org/10.1086/322832
[31] Nombela, G. and de Rus, G. (2004) Flexible-Term Contracts for Road Franchising. Transportation Research Part A: Policy and Practice, 38, 163-179. https://doi.org/10.1016/j.tra.2003.10.002
[32] Niu, B. and Zhang, J. (2013) Price, Capacity and Concession Period Decisions of Pareto-Efficient BOT Contracts with Demand Uncertainty. Transportation Research Part E: Logistics & Transportation Review, 53, 1-14. https://doi.org/10.1016/j.tre.2013.01.012
[33] Scandizzo, P.L. and Venturab, M. (2010) Sharing Risk through Concession Contracts. European Journal of Operational Research, 207, 363-370. https://doi.org/10.1016/j.ejor.2010.04.008
[34] Carbonara, N., Pellegrino, R., Carbonara, N. and Pellegrino, R. (2018) Public-Private Partnerships for Energy Efficiency Projects: A Win-Win Model to Choose the Energy Performance Contracting Structure. Journal of Cleaner Production, 170, 1064-1075.
https://doi.org/10.1016/j.jclepro.2017.09.151
[35] Xu, H. and Li, Q. (2010) The Game Theory Analysis of Risk Share for PPP Project Based on Shapley Value. 2010 2nd IEEE International Conference on Information Management and Engineering, Chengdu, 16-18 April 2010, 112-115. https://doi.org/10.1109/icime.2010.5477813
[36] Burke, R. and Demirag, I. (2016) Risk Transfer and Stakeholder Relationships in Public Private Partnerships. Accounting Forum, 41, 28-43. https://doi.org/10.1016/j.accfor.2016.06.004
[37] Saussier, S. (2000) Transaction Costs and Contractual Incompleteness: The Case of électricité de France. Journal of Economic Behavior & Organization, 42, 189-206.
https://doi.org/10.1016/s0167-2681(00)00085-8
[38] Lahdenpera, P. (2010), Conceptualizing a Two-Stage Target-Cost Arrangement for Competitive Cooperation. Construction Management and Economics, 28, 783-796.
https://doi.org/10.1080/01446193.2010.487534
[39] Feng, Z., Zhang, S.B. and Gao, Y. (2014) On Oil Investment and Production: A Comparison of Production Sharing Contracts and Buyback Contracts. Energy Economics, 42, 395-402.
https://doi.org/10.1016/j.eneco.2014.01.010
[40] Sheu, J.B. (2011) Marketing-Driven Channel Coordination with Revenue-Sharing Contracts under Price Promotion to End-Customers. European Journal of Operational Research, 214, 246-255.
https://doi.org/10.1016/j.ejor.2011.04.031
[41] Lippman, S.A., Mccardle, K.F. and Tang, C.S. (2013) Using Nash Bargaining to Design Project Management Contracts under Cost Uncertainty. International Journal of Production Economics, 145, 199-207. https://doi.org/10.1016/j.ijpe.2013.04.036
[42] Shang, T., Zhang, K., Liu, P., Chen, Z., Li, X. and Wu, X. (2015) What to Allocate and How to Allocate?—Benefit Allocation in Shared Savings Energy Performance Contracting Projects. Energy, 91, 60-71. https://doi.org/10.1016/j.energy.2015.08.020
[43] Qiu, L.D. and Wang, S. (2011) BOT Projects: Incentives and Efficiency. Journal of Development Economics, 94, 127-138. https://doi.org/10.1016/j.jdeveco.2009.11.008
[44] Martimort, D. (2006) An Agency Perspective on the Costs and Benefits of Privatization. Journal of Regulatory Economics, 30, 5-44.
[45] Ministry of Finance of China No. 156 (2014) PPP Project Contract Guide (Trial) (in Chinese).
http://www.cpppc.org/zh/bmwj/2670.jhtml
[46] Grimsey, D. and Lewis, M.K. (2002) Evaluating the Risks of Public Private Partnerships for Infrastructure Projects. International Journal of Project Management, 20, 107-118.
https://doi.org/10.1016/s0263-7863(00)00040-5