Research on the Equilibrium of a Revenue Sharing Contract in a Transfer-Operation-Transfer Project Based on the Theory of Share Tenancy
Abstract:
To solve the transfer-operate-transfer (TOT) project contract model selection, contract structure optimization and the largest revenue of government and private partners, a revenue-sharing contract (RSC) structure equilibrium model of a TOT project is constructed based on the theory of share tenancy. According to the key parameters of RSC structure, the algebraic model is constructed by using the Lagrange multiplier method, and the geometric model is built by adopting the dynamic equilibrium method. The equilibrium conditions of the two models are obtained under the constraints of the maximization of income of both parties, and the equilibrium conditions of two models are verified as completely consistent. The result shows that 1) The RSC structure of the TOT project can achieve Pareto optimality and maximize revenue for both parties; 2) As the proportion of participants’ investment or risk sharing increases, their revenue-sharing ratio (RSR) will increase, and vice versa; 3) Regardless of transaction costs, the three contract models are equivalent; considering the transaction costs, the revenue share of the government in the RSC is greater than that in the equilibrium state. 4) Changing the assumptions, the equilibrium model can still provide ideas for revenue sharing contract structure and efficiency optimization.
Cite this paper: Du, Y. , Fang, J. and Hu, J. (2019) Research on the Equilibrium of a Revenue Sharing Contract in a Transfer-Operation-Transfer Project Based on the Theory of Share Tenancy. American Journal of Industrial and Business Management, 9, 1111-1135. doi: 10.4236/ajibm.2019.95076.
References

[1]   Chen, C. and Doloi, H. (2008) BOT Application in China: Driving and Impeding Factors. International Journal of Project Management, 26, 388-398.
https://doi.org/10.1016/j.ijproman.2007.07.002

[2]   Almarri, K. (2016) Improving PPP Contract Design for Procurement of Public Projects. The 10th International Conference on Project Management, Gold Coast, Australia, November 2016, 19-27.

[3]   Ng, S.T., Xie, J., Cheung, Y.K. and Jefferies, M. (2007) A Simulation Model for Optimizing the Concession Period of Public-Private Partnerships Schemes. International Journal of Project Management, 25, 791-798. https://doi.org/10.1016/j.ijproman.2007.05.004

[4]   Cheng, Z., Ke, Y., Lin, J., Yang, Z. and Cai, J. (2016) Spatio-Temporal Dynamics of Public Private Partnership Projects in China. International Journal of Project Management, 34, 1242-1251. https://doi.org/10.1016/j.ijproman.2016.05.006

[5]   Zhang, X. (2005) Financial Viability Analysis and Capital Structure Optimization in Privatized Public Infrastructure Projects. Journal of Construction Engineering & Management, 131, 656-668. https://doi.org/10.1061/(asce)0733-9364(2005)131:6(656)

[6]   Song, H. and Gao, X. (2018) Green Supply Chain Game Model and Analysis under Revenue-Sharing Contract. Journal of Cleaner Production, 170, 183-192.
https://doi.org/10.1016/j.jclepro.2017.09.138

[7]   Almarri, K. and Blackwell, P. (2014) Improving Risk Sharing and Investment Appraisal for PPP Procurement Success in Large Green Projects. Procedia-Social and Behavioral Sciences, 119, 847-856. https://doi.org/10.1016/j.jclepro.2017.09.138

[8]   Shan, X.Q. and Ye, X.S. (2012) Research on Public-Private Financing Mode of Public Rental Housing and Its Selection. 2012 International Conference on Management Science & Engineering 19th Annual Conference Proceedings, Dallas, TX, 20-22 September 2012, 1787-1793.
https://doi.org/10.1109/icmse.2012.6414414

[9]   Kang, C.C., Feng, C.M. and Kuo, C.Y. (2011) A Royalty Negotiation Model for BOT (Build-Operate-Transfer) Projects: The Operational Revenue-Based Model. Mathematical & Computer Modelling, 54, 2338-2347. https://doi.org/10.1016/j.mcm.2011.05.042

[10]   Wang, Y. and Liu, J. (2015) Evaluation of the Excess Revenue Sharing Ratio in PPP Projects Using Principal-Agent Models. International Journal of Project Management, 33, 1317-1324.
https://doi.org/10.1016/j.ijproman.2015.03.002

[11]   Abhishek, V., Hajek, B. and Williams, S.R. (2013) Auctions with a Profit Sharing Contract. Games & Economic Behavior, 77, 247-270. https://doi.org/10.1016/j.geb.2012.10.007

[12]   Ortiz, I.N. and Buxbaum, J.N. (2008) Protecting the Public Interest in Long-Term Concession Agreements for Transportation Infrastructure. Public Works Management & Policy, 13, 126-137.
https://doi.org/10.1177/1087724x08326175

[13]   Song, J., Jin, L., Zhao, Y. and Hu, W. (2017) Using Bargaining-Game Model to Negotiate Compensation for the Early Termination of BOT Highway Projects. Transportation Research Part: A Policy & Practice, 105, 197-209. https://doi.org/10.1177/1087724x08326175

[14]   Qian, G.X., Zhang, Y.P., Jian-Guo, W.U. and Pan, Y.H. (2013) Revenue Sharing in Dairy Industry Supply Chain—A Case Study of Hohhot, China. Journal of Integrative Agriculture, 12, 2300-2309. https://doi.org/10.1016/s2095-3119(13)60585-7

[15]   Iossa, E. and Martimort, D. (2015) The Simple Microeconomics of Public-Private Partnerships. Journal of Public Economic Theory, 17, 4-48. https://doi.org/10.1111/jpet.12114

[16]   Sérgiodomingues, Dejanzlatkovic and Athenaroumboutsos (2014) Contractual Flexibility in Transport Infrastructure PPP. European Transport Conference 2014, Frankfurt, October 2014, 1-19.

[17]   Iseki, H. and Houtman, R. (2012) Evaluation of Progress in Contractual Terms: Two Case Studies of Recent DBFO PPP Projects in North America. Research in Transportation Economics, 36, 73-84. https://doi.org/10.1016/j.retrec.2012.03.004

[18]   Zhang, X. (2005) Critical Success Factors for Public-Private Partnerships in Infrastructure Development. Journal of Construction Engineering & Management, 131, 3-14.

[19]   Liu, J., Gao, R., Cheah, C.Y.J. and Luo, J. (2016) Incentive Mechanism for Inhibiting Investors’ Opportunistic Behavior in PPP Projects. International Journal of Project Management, 34, 1102-1111. https://doi.org/10.1016/j.ijproman.2016.05.013

[20]   Cotula, L. (2010) Investment Contracts and Sustainable Development: How to Make Contracts for Fairer and More Sustainable Natural Resource Investments. International Institute for Environment and Development, London.

[21]   Shen, L.Y., Bao, H.J., Wu, Y.Z. and Lu, W.S. (2007) Using Bargaining-Game Theory for Negotiating Concession Period for BOT-Type Contract. Journal of Construction Engineering & Management, 133, 385-392. https://doi.org/10.1061/(asce)0733-9364(2007)133:5(385)

[22]   Kang, C.C., Feng, C.M. and Huang, S.C. (2007) A New Financial Engineering Model for Analyzing the Royalty of BOT Projects: The Taiwan Case. IEEE International Conference on Industrial Engineering and Engineering Management, Singapore, 2-4 December 2007, 277-281.
https://doi.org/10.1109/ieem.2007.4419195

[23]   Ke, Y., Wang, S.Q., Chan, A.P.C. and Lam, P.T.I. (2010) Preferred Risk Allocation in China’s Public-Private Partnership (PPP) Projects. International Journal of Project Management, 28, 482-492. https://doi.org/10.1016/j.ijproman.2009.08.007

[24]   Schepper, S.D., Dooms, M. and Haezendonck, E. (2014) Stakeholder Dynamics and Responsibilities in Public-Private Partnerships: A Mixed Experience. International Journal of Project Management, 32, 1210-1222. https://doi.org/10.1016/j.ijproman.2014.01.006

[25]   Cheung, S.N.S. (1969) The Theory of Share Tenancy: With Special Application to Asian Agriculture and the First Phase of Taiwan Land Reform. The University of Chicago Press, Chicago and London, 3-4, 85-87.

[26]   Cheung, S.N.S. (2014) The Choice of Institutional Arrangements (Economic Explanation, Book Four). China Citic Press, Beijing.

[27]   Cheung, S.N.S. (1969) The Theory of Share Tenancy: With Special Application to Asian Agriculture and the First Phase of Taiwan Land Reform. The University of Chicago Press, Chicago and London, 3-4, 85-87, 84.

[28]   Shen, L.Y., Li, H. and Li, Q.M. (2002) Alternative Concession Model for Build Operate Transfer Contract Projects. Journal of Construction Engineering and Management, 128, 326-330. https://doi.org/10.1061/(asce)0733-9364(2002)128:4(326)

[29]   Hanaoka, S. and Palapus, H.P. (2012) Reasonable Concession Period for Build-Operate-Transfer Road Projects in the Philippines. International Journal of Project Management, 30, 938-949.
https://doi.org/10.1016/j.ijproman.2012.02.001

[30]   Engel, E.M.R.A., Fischer, R.D. and Galetovic, A. (2001) Least-Present-Value-of-Revenue Auctions and Highway Franchising. Journal of Political Economy, 109, 993-1020.
https://doi.org/10.1086/322832

[31]   Nombela, G. and de Rus, G. (2004) Flexible-Term Contracts for Road Franchising. Transportation Research Part A: Policy and Practice, 38, 163-179. https://doi.org/10.1016/j.tra.2003.10.002

[32]   Niu, B. and Zhang, J. (2013) Price, Capacity and Concession Period Decisions of Pareto-Efficient BOT Contracts with Demand Uncertainty. Transportation Research Part E: Logistics & Transportation Review, 53, 1-14. https://doi.org/10.1016/j.tre.2013.01.012

[33]   Scandizzo, P.L. and Venturab, M. (2010) Sharing Risk through Concession Contracts. European Journal of Operational Research, 207, 363-370. https://doi.org/10.1016/j.ejor.2010.04.008

[34]   Carbonara, N., Pellegrino, R., Carbonara, N. and Pellegrino, R. (2018) Public-Private Partnerships for Energy Efficiency Projects: A Win-Win Model to Choose the Energy Performance Contracting Structure. Journal of Cleaner Production, 170, 1064-1075.
https://doi.org/10.1016/j.jclepro.2017.09.151

[35]   Xu, H. and Li, Q. (2010) The Game Theory Analysis of Risk Share for PPP Project Based on Shapley Value. 2010 2nd IEEE International Conference on Information Management and Engineering, Chengdu, 16-18 April 2010, 112-115. https://doi.org/10.1109/icime.2010.5477813

[36]   Burke, R. and Demirag, I. (2016) Risk Transfer and Stakeholder Relationships in Public Private Partnerships. Accounting Forum, 41, 28-43. https://doi.org/10.1016/j.accfor.2016.06.004

[37]   Saussier, S. (2000) Transaction Costs and Contractual Incompleteness: The Case of électricité de France. Journal of Economic Behavior & Organization, 42, 189-206.
https://doi.org/10.1016/s0167-2681(00)00085-8

[38]   Lahdenpera, P. (2010), Conceptualizing a Two-Stage Target-Cost Arrangement for Competitive Cooperation. Construction Management and Economics, 28, 783-796.
https://doi.org/10.1080/01446193.2010.487534

[39]   Feng, Z., Zhang, S.B. and Gao, Y. (2014) On Oil Investment and Production: A Comparison of Production Sharing Contracts and Buyback Contracts. Energy Economics, 42, 395-402.
https://doi.org/10.1016/j.eneco.2014.01.010

[40]   Sheu, J.B. (2011) Marketing-Driven Channel Coordination with Revenue-Sharing Contracts under Price Promotion to End-Customers. European Journal of Operational Research, 214, 246-255.
https://doi.org/10.1016/j.ejor.2011.04.031

[41]   Lippman, S.A., Mccardle, K.F. and Tang, C.S. (2013) Using Nash Bargaining to Design Project Management Contracts under Cost Uncertainty. International Journal of Production Economics, 145, 199-207. https://doi.org/10.1016/j.ijpe.2013.04.036

[42]   Shang, T., Zhang, K., Liu, P., Chen, Z., Li, X. and Wu, X. (2015) What to Allocate and How to Allocate?—Benefit Allocation in Shared Savings Energy Performance Contracting Projects. Energy, 91, 60-71. https://doi.org/10.1016/j.energy.2015.08.020

[43]   Qiu, L.D. and Wang, S. (2011) BOT Projects: Incentives and Efficiency. Journal of Development Economics, 94, 127-138. https://doi.org/10.1016/j.jdeveco.2009.11.008

[44]   Martimort, D. (2006) An Agency Perspective on the Costs and Benefits of Privatization. Journal of Regulatory Economics, 30, 5-44.

[45]   Ministry of Finance of China No. 156 (2014) PPP Project Contract Guide (Trial) (in Chinese).
http://www.cpppc.org/zh/bmwj/2670.jhtml

[46]   Grimsey, D. and Lewis, M.K. (2002) Evaluating the Risks of Public Private Partnerships for Infrastructure Projects. International Journal of Project Management, 20, 107-118.
https://doi.org/10.1016/s0263-7863(00)00040-5

 
 
Top