[1] Cui, Q.B., Hastak, M. and Halpin, D. (2010) Systems Analysis of Project Cash Flow Management Strategies. Construction Management and Economics, 28, 361-376.
https://doi.org/10.1080/01446191003702484
[2] Cattell, D., Bowen, P. and Kaka, A. (2007) Review of Unbalanced Bidding Models in Construction. Journal of Construction Engineering & Management, 133, 562-573.
https://doi.org/10.1061/(ASCE)0733-9364(2007)133:8(562)
[3] McGreevy, S.L. (2002) Unbalanced Bids Are Risky Business.
http://www.contractormag.com/articles/column.cfm?columnid=161
[4] Hyari, K., Tarawneh, Z. and Katkhuda, H. (2016) Detection Model for Unbalanced Pricing in Construction Projects: A Risk-Based Approach. Journal of Construction Engineering & Management, 142, 1-10.
https://doi.org/10.1061/(ASCE)CO.1943-7862.0001203
[5] Hoogenboom, J., Dale, W. and Martell, C. (2006) Risk Analysis and Optimization of the (Un)balanced Bid. AACE International transactions, 7, 1-6.
[6] Cattell, D., Bowen, P. and Kaka, A. (2008) A Simplified Unbalanced Bidding Model. Construction Management and Economics, 26, 1283-1290.
https://doi.org/10.1080/01446190802570506
[7] Liu, X., Lin, L. and Zang, D. (2009) Stochastic Programming Models and Hybrid Intelligent Algorithm for Unbalanced Bidding Problem. Journal of Computing and Information Science in Engineering, 2, 188-194.
https://doi.org/10.5539/cis.v2n1p188
[8] American Association of State Highway and Transportation Officials (2004) State DOT Procedures for the Evaluation of Materially Unbalanced Bids. American Association of State Highway and Transportation Officials, Washington DC.
[9] Wang, W. (2004) Electronic-Based Procedure for Managing Unbalanced Bids. Journal of Construction Engineering & Management, 130, 455-460.
https://doi.org/10.1061/(ASCE)0733-9364(2004)130:3(455)
[10] Arditi, D. and Chotibhongs, R. (2009) Detection and Prevention of Unbalanced Bids. Construction Management and Economics, 27, 721-732.
https://doi.org/10.1080/01446190903117785
[11] Shrestha, P.P., Shrestha, K. and Joshi, V. (2012) Investigation of Unbalanced Bidding for Economic Sustainability. Proceedings of International Conference on Sustainable Design, Engineering, and Construction, Fort Worth, 7-9 November 2012, 609-615.
[12] Skitmore, M. and Cattell, D. (2013) On Being Balanced in an Unbalanced World. Journal of the Operational Research Society, 64, 138.
https://doi.org/10.1057/jors.2012.29
[13] Hyari, K.H. (2015) Handling Unbalanced Bidding in Construction Projects: Prevention Rather than Detection. Journal of Construction Engineering & Management, 142, 1-10.
https://doi.org/10.1061/(ASCE)CO.1943-7862.0001045
[14] Afshar, A. and Amiri, H. (2010a) A Min-Max Regret Approach to Unbalanced Bidding in Construction. KSCE Journal of Civil Engineering, 14, 653-661.
https://doi.org/10.1007/s12205-010-0972-0
[15] Afshar, A. and Amiri, H. (2010b) Risk-Based Approach to Unbalanced Bidding in Construction Projects. Optim Engineering, 42, 369-385.
https://doi.org/10.1080/03052150903220964
[16] Peterson, S.J. (2009) Construction Accounting and Financial Management. Pearson Education, Inc., Upper Saddle River.
[17] Mincks, W.R. and Johnston, H. (2011) Construction Jobsite Management. 3rd Edition, Delmar Cengage Learning, Clifton Park.
[18] Shim, E. and Kim, S.J. (2016) Cost Item-Based Markup Distribution in Construction Projects. The Journal of Technology, Management, and Applied Engineering, 32, 1-26.