Back
 ENG  Vol.8 No.11 , November 2016
Productivity Testing Design Method of Multi-Factor Control for Unconsolidated Sandstone Gas Reservoir
Abstract: Reservoir safety, testing-string safety, and flow control are key factors that should be considered in deep-water unconsolidated sandstone gas well testing work system. Combined with the feature of testing reservoir, pipe string type and sea area, the required minimum testing flow rate during cleaning up process, as well as minimum test flow rate without hydrate generation, pipe string erosion critical production, the maximum testing flow rate without destroying sand formation and the minimum output of meeting the demand of development was analyzed; based on the above critical test flow rates, testing working system is designed. Field application showed that the designed work system effectively provided good guidance for field test operations; no sand production or hydrate generation happened during the test process; the test parameter evaluated the reservoir accurately; the safe and efficient test operation was achieved.
Cite this paper: Wu, M. , Liang, H. , Zhang, M. , Sun, D. and Zhong, P. (2016) Productivity Testing Design Method of Multi-Factor Control for Unconsolidated Sandstone Gas Reservoir. Engineering, 8, 815-822. doi: 10.4236/eng.2016.811073.
References

[1]   Yin, B.T., Li, X.F., Du, H., et al. (2011) An Optimization Design for the Well Completion Test Technology. Acta Petrolei Sinica, 6, 1072-1077.

[2]   Wang, Z.F., Li, X.S., Sun, Z.P., et al. (2011) Hydrocarbon Accumulation Conditions and Exploration Potential in the Deep-Water Region, Qiongdongnan Basin. China Offshore Oil and Gas, 23, 7-13.

[3]   Li, Q.P. (2006) The Situation and Challenges for Deepwater Oil and Gas Exploration and Exploitation in China. China Offshore Oil and Gas, 2, 130-133.

[4]   Dai, Z., Luo, D.H., Liang, W., et al. (2012) A DST Design and Practice in Deep-Water Gas Fields, South China Sea. China Offshore Oil and Gas, 1, 25-28.

[5]   Yang, S.K., Dai, Y.D., Lv, Y. and Guan, L.J. (2009) Key Techniques of Gas Well Testing in South China Sea Deep Water. China Offshore Oil and Gas, 4, 237-241.

[6]   Chen, S.-M., Gong, W.X.W. and Antle, G. (2008) DST Design for Deepwater Wel with Potential Gas Hydrate Problems. OTC 19162.

[7]   Chen, S.-M. (2010) Un-Planed Shut-In and Deepwater Gas Hydrate Prevention. OTC 20436.

[8]   Tan, Z.J., Xiang, H., Liu, F.K. and Lv, X.C. (2006) Testing Techniques for Complex Reservoirs and Their Application in Bohai Sea. China Offshore Oil and Gas, 4, 223-228.

[9]   Dick, A.J. and Marcella, L., Expro Intl. Group PLC. (2005) Deep Water Subsea Controls for Completions and Interventions. OTC 17694.

[10]   Obuekwe, M.O.G.B.O. (2010) Deepwater DST Design, Planning and Operations—Offshore Niger Delta Experience. SPE 133772.

 
 
Top