[1] Wang, T.T. (2014) Construction Engineering Technology and Design. Elaborate on the Key Points of Construction Quality Control of Bored Pile in Housing Construction. No. 19, 21-22.
[2] GanRunqingGan, R.Q.(2013) Urban Architecture Theory Research: Electronic Edition. Discussion on the Construction Technology of the Pore-forming Pouring Pile for Housing Construction. No. 28, 12-13.
[3] Dong, L.Z. (2013) Urban Construction Theory Research, Electronic Edition. The Construction of the Pore-forming Pouring Pile in Housing Construction. No. 19, 13-15.
[4] Pei, C.M. (2015) Construction Engineering Technology and Design. Discussion on the Construction Technology of the Pore-forming Pouring Pile in Housing Construction. No. 22, 31-33.
[5] Wang, C.H. (2014) Urban Construction Theory: Electronic Edition. Discussion on the Construction Technology of the Pore-forming Pouring Pile in Housing Construction. No. 21, 12-13.
[6] Sawant, V.A. and Chore, H.S. (2010) Building Frame-Pile Foundation-Soil Interactive Analysis Using 3-D FEM. Journal of Structural Engineering (JoSE), 36, 318-325.
[7] Polous, H.G. (1968) Analysis of Settlement of Pile Groups. Géotechnique, 18, 449-471.
http://dx.doi.org/10.1680/geot.1968.18.4.449