Back
 AJIBM  Vol.6 No.9 , September 2016
The Application of Reliability Methods for Aircraft Design Project Management
Abstract: In aircraft project management, reliability and maintainability are fundamental for ensuring system safety, for optimizing the manufacturing process and for improving assembly/disassembly operations when maintenance actions are required. The inclusion of such requirements helps to minimize life cycle costs, augments the residual lifetime of aircraft and consequently increases customer satisfaction. While most papers published in the aircraft engineering literature are rather evasive or do not accurately describe the role of reliability and maintainability (RM) methods in early design phases, this paper elucidates the problem. This paper discusses various concepts such as design for reliability and risk assessment analysis for improving aircraft safety and reliability at the deployment stages. The article also focuses on how reliability prediction issues are addressed using various methods, tools and standards, such as failure modes and effect analysis, fault tree analysis and guidelines such as MIL-STD-217f and ARP4754. Finally, this paper demonstrates that reliability is crucial to consider in all phases of the life cycle of an aircraft.
Cite this paper: Vieira, D. , Rebaiaia, M. and Chain, M. (2016) The Application of Reliability Methods for Aircraft Design Project Management. American Journal of Industrial and Business Management, 6, 967-992. doi: 10.4236/ajibm.2016.69094.
References

[1]   Airbus (2016) Final Assembly and Tests.
http://www.airbus.com/company/aircraft-manufacture/how-is-an-aircraft-built/final-assembly-and-tests/

[2]   Alcouffe, C. and Corrégé, N. (2004) Structures de Gouvernance dans l’entreprise étendue: L’exemple d’Airbus [Governance Structures in the Extended Enterprise: The Example of Airbus (No. 393)]: LIRHE-Unité mixte de recherche [Joint Research Unit CNRS/UT1o]. Université des Sciences Sociales de Toulouse/Social Sciences University of Toulouse.

[3]   Boeing (2015) Current Market Outlook 2015-2034.
http://www.boeing.com/resources/boeingdotcom/commercial/about-our-market/assets/downloads/Boeing_Current_Market_Outlook_2015.pdf

[4]   Altfeld, H.-H. (2010) Commercial Aircraft Projects: Managing the Development of Highly Complex Products. Ashgate, Burlington.

[5]   Johansson, C. (2013) On System Safety and Reliability in Early Design Phases: Cost Focused Optimization Applied on Aircraft Systems. Linköping University, Linköping.

[6]   Kerzner, H.R. (2013) Project Management: A Systems Approach to Planning, Scheduling, and Controlling. John Wiley, New York.

[7]   Mattingly, J.D. (2002) Aircraft Engine Design. American Institute of Aeronautics and Astronautics, Reston.

[8]   Gudmundsson, S. (2013) General Aviation Aircraft Design: Applied Methods and Procedures. Butterworth-Heinemann, Oxford.

[9]   Sutter, J. and Spenser, J. (2010) 747: Creating the World’s First Jumbo Jet and Other Adventures from a Life in Aviation. HarperCollins, New York.

[10]   Thamhain, H. (2013) Managing Risks in Complex Projects. Project Management Journal, 44, 20-35.
http://dx.doi.org/10.1002/pmj.21325

[11]   Amalberti, R. (1996) La Conduite de Systèmes à Risques: Le Travail à L’hôpital. Presses Universitaires de France, Paris.

[12]   Del Castillo, A. and Firoozmand, F. (Eds.) (2009) Development of a Reliability Program for Adjusting Aircraft Functional Check Task Intervals. 3rd CTA-DLR Workshop on Data Analysis & Flight Control, São José dos Campos, 14-16 September 2009, 1-5.

[13]   Johnson Jr., A.M. and Malek, M. (1988) Survey of Software Tools for Evaluating Reliability, Availability, and Serviceability. ACM Computing Surveys, 20, 227-269.
http://dx.doi.org/10.1145/50020.50062

[14]   Susova, G.M. and Petrov, A.N. (Eds.) (1997) Markov Model-Based Reliability and Safety Evaluation for Aircraft Maintenance-System Optimization. Annual Reliability and Maintainability Symposium, Philadelphia, 13-16 January 1997, 29-36.
http://dx.doi.org/10.1109/RAMS.1997.571660

[15]   Teal, C. and Sorensen, D. (Eds.) (2001) Condition Based Maintenance. 20th Conference on Digital Avionics Systems, Daytona Beach, 14-18 October 2011, 3B2/1-3B2/7.

[16]   Tiassou, K. (2013) Aircraft Operational Reliability: A Model-Based Approach and Case Studies. INSA de Toulouse.

[17]   Bensoussan, A. (Ed.) (2013) Probabilistic Design for Reliability (PDfR) in Space Electronics and Photonics: A Change of Vision. 2013 European Microelectronics Packaging Conference (EMPC), Grenoble, 9-12 September 2013, 1-7.

[18]   Silverman, M. and Kleyner, A. (Eds.) (2012) What Is Design for Reliability and What Is Not? Annual Reliability and Maintainability Symposium (RAMS), Reno, 23-26 January 2012, 1-5.

[19]   Suhir, E. (2012) When Adequate and Predictable Reliability Is Imperative. Microelectronics Reliability, 52, 2342-2346.
http://dx.doi.org/10.1016/j.microrel.2012.07.037

[20]   Silveira, E., Atxaga, G. and Irisarri, A. (2010) Failure Analysis of Two Sets of Aircraft Blades. Engineering Failure Analysis, 17, 641-647.
http://dx.doi.org/10.1016/j.engfailanal.2008.10.015

[21]   Su, X., Deng, Y., Mahadevan, S. and Bao, Q. (2012) An Improved Method for Risk Evaluation in Failure Modes and Effects Analysis of Aircraft Engine Rotor Blades. Engineering Failure Analysis, 26, 164-174.
http://dx.doi.org/10.1016/j.engfailanal.2012.07.009

[22]   SAE-ARP26 Rev B (1997) Fault/Failure Analysis Procedure. SAE International, Troy.

[23]   Berman, B. (2003) Effective Risk Management and Quality Improvement by Application of FMEA and Complementary Techniques.
http://www.paragonrx.com/experience/white-papers/effective-risk-management-and-quality-improvement

[24]   Xie, M., Yao, H. and Zhao, Z. (2011) Failure Analysis on Tread Throw of the Tire of B737-800 Airplane. Engineering Failure Analysis, 18, 789-796.
http://dx.doi.org/10.1016/j.engfailanal.2010.12.024

[25]   Kumari, S., Satyanarayana, D. and Srinivas, M. (2014) Failure Analysis of Gas Turbine Rotor Blades. Engineering Failure Analysis, 45, 234-244.
http://dx.doi.org/10.1016/j.engfailanal.2014.06.003

[26]   Airbus (2015) Airbus Global Market Forecast 2015-2034.
http://www.airbus.com/company/market/forecast/

[27]   Hammer, J. (2016) The Real Story of Germanwings Flight 9525.
http://www.gq.com/story/germanwings-flight-9525-final-moments

[28]   7sur7. (2015) La Durée de Vie D’un A320 est de 35 à 40 Ans [The Life Time of an A320 is 35 to 40 Years].
http://www.7sur7.be/7s7/fr/33226/Crash-d-un-Airbus-A320-en-France/article/detail/2263210/2015/03/24/La-duree-de-vie-d-un-A320-est-de-35-a-40-ans.dhtml

[29]   Nieto, P.G., Garcia-Gonzalo, E., Lasheras, F.S. and de Cos Juez, F.J. (2015) Hybrid PSO-SVM-Based Method for Forecasting of the Remaining Useful Life for Aircraft Engines and Evaluation of its Reliability. Reliability Engineering and System Safety, 138, 219-231.
http://dx.doi.org/10.1016/j.ress.2015.02.001

[30]   Vieira, D.R. and Bravo, A. (2016) Life Cycle Carbon Emissions Assessment Using an Eco-Demonstrator Aircraft: The Case of an Ecological Wing Design. Journal of Cleaner Production, 124, 246-257.
http://dx.doi.org/10.1016/j.jclepro.2016.02.089

[31]   Associated Press (2014) Malaysia Airlines Flight MH370: Airlines Urge More Security Checks.
http://www.cbc.ca/news/world/malaysia-airlines-flight-mh370-airlines-urge-more-security-checks-1.2593720

[32]   Harry, M.J. and Schroeder, R.R. (2005) Six Sigma: The Breakthrough Management Strategy Revolutionizing the World’s Top Corporations. Currency, New York.

[33]   MIL-217 (1991) Military Handbook: Reliability Prediction of Electronic Equipment: MIL-HDBK-217F: 2 December 1991. Department of Defense, Washington DC.

[34]   Saglimbene, M. (Ed.) (2009) Reliability Analysis Techniques: How They Relate to Aircraft Certification. Annual Reliability and Maintainability Symposium (RAMS), Fort Worth, 26-29 January 2009, 218-222.
http://dx.doi.org/10.1109/rams.2009.4914678

[35]   Rebaiaia, M.-L. (2011) A Contribution to the Evaluation and Optimization of Networks Reliability, Université Laval, Québec.

[36]   MIL-STD-1553 (2010) Designer’s Guide. 6th Edition, Department of Defense, Washington DC.

[37]   Gu, H. and Fu, G. (2013) Failure Analysis of the Adhesive Joint of Microwave Ferrite Phase Shifter. Engineering Failure Analysis, 33, 367-380.
http://dx.doi.org/10.1016/j.engfailanal.2013.06.003

[38]   Busic, Z., Lovrc, Z., Amc, E., Busic, V., Lovrc, L. and Markovc, I. (2006) War Injuries of the Extremities: Twelve-Year Follow-Up Data. Military Medicine, 171, 55-57.
http://dx.doi.org/10.7205/MILMED.171.1.55

[39]   Debrincat, J., Bil, C. and Clark, G. (2013) Assessing Organizational Factors in Aircraft Accidents Using a Hybrid Reason and AcciMap Model. Engineering Failure Analysis, 27, 52-60.
http://dx.doi.org/10.1016/j.engfailanal.2012.06.003

[40]   Ellery, A., Kreisel, J. and Sommer, B. (2008) The Case for Robotic On-Orbit Servicing of Spacecraft: Spacecraft Reliability Is a Myth. Acta Astronautica, 63, 632-648.
http://dx.doi.org/10.1016/j.actaastro.2008.01.042

[41]   Wong, C.N., Huang, H.-Z. and Li, N. (2013) Fourier Series Based Reliability Analysis of Aeroengine Turbine Blade under Linear Fuzzy Safety State. Engineering Failure Analysis, 31, 268-280.
http://dx.doi.org/10.1016/j.engfailanal.2013.02.007

[42]   Tsagkas, V., Nathanael, D. and Marmaras, N. (2014) A Pragmatic Mapping of Factors Behind Deviating Acts in Aircraft Maintenance. Reliability Engineering and System Safety, 130, 106-114.
http://dx.doi.org/10.1016/j.ress.2014.05.011

[43]   Feng, Q., Li, S. and Sun, B. (2014) A Multi-Agent Based Intelligent Configuration Method for Aircraft Fleet Maintenance Personnel. Chinese Journal of Aeronautics, 27, 280-290.
http://dx.doi.org/10.1016/j.cja.2014.02.016

[44]   Kumar, U.D., Crocker, J. and Knezevic, J. (Eds.) (1999) Evolutionary Maintenance for Aircraft Engines. Annual Reliability and Maintainability Symposium (RAMS), Washington DC, 18-21 January 1999, 62-68.

[45]   Liang, Z., Feng, Y., Zhang, X., Wu, T. and Chaovalitwongse, W.A. (2015) Robust Weekly Aircraft Maintenance Routing Problem and the Extension to the Tail Assignment Problem. Transportation Research Part B: Methodological, 78, 238-259.
http://dx.doi.org/10.1016/j.trb.2015.03.013

[46]   Raju, V., Gandhi, O. and Deshmukh, S. (2012) Maintenance, Repair, and Overhaul Performance Indicators for Military Aircraft. Defense Science Journal, 62, 83-89.
http://dx.doi.org/10.14429/dsj.62.881

[47]   Rodrigues, D. and Lavorato, P. (2016) Maintenance, Repair and Overhaul (MRO) Fundamentals and Strategies: An Aeronautical Industry Overview. International Journal of Computer Applications, 135, 21-29.
http://dx.doi.org/10.5120/ijca2016908563

[48]   Spasic, D.M., Stupar, S.N., Simonovic, A.M., Trifkovic, D. and Ivanov, T.D. (2014) The Failure Analysis of the Star-Separator of an Aircraft Cannon. Engineering Failure Analysis, 42, 74-86.
http://dx.doi.org/10.1016/j.engfailanal.2014.03.022

[49]   Witek, L. (2006) Failure Analysis of Turbine Disc of an Aero Engine. Engineering Failure Analysis, 13, 9-17.
http://dx.doi.org/10.1016/j.engfailanal.2004.12.028

[50]   Yang, J., Huang, H.-Z., He, L.-P., Zhu, S.-P. and Wen, D. (2011) Risk Evaluation in Failure Mode and Effects Analysis of Aircraft Turbine Rotor Blades Using Dempster-Shafer Evidence Theory Under Uncertainty. Engineering Failure Analysis, 18, 2084-2092.
http://dx.doi.org/10.1016/j.engfailanal.2011.06.014

[51]   MIL-P-16594A (1955) Military Specification: Manufacture of Projectiles, Bombs, Rockets, and Guided Missile Warheads.

 
 
Top