Test Study on Navigation in the First Construction Period of Lize Navigation-Power Junction
Abstract: Based on the test results of Lize navigation-power junction construction diversion through the normal fix-bed model with the scale of 1:100, the navigation flow condition in each construction diversion period is studied. There are a lot of problems in the first construction diversion period, such as excessive flow velocity, poor flow pattern, low navigation discharge and so on. To solve these problems, the comprehensive engineering measures for improving the navigation flow condition during construction are put forward. Among them, the structure forms of construction diversion cofferdam are optimized. Finally, the highest safe navigation discharge and reasonable navigation route are proposed. The experimental results obtained from the optimization scheme of the first construction diversion period are better than these from the original scheme in terms of flow velocity, flow pattern and so on. The research results may serve as reference for similar engineering.
Cite this paper: Chen, K. (2016) Test Study on Navigation in the First Construction Period of Lize Navigation-Power Junction. Engineering, 8, 332-338. doi: 10.4236/eng.2016.86030.
References

[1]   Huang, L.-C., Jing, S.-Q. and Liu, C. (2001)Test and Study of Navigation Flow Condition during Construction Period for Zhuzhou Junction Project of Xiangjiang River. Port &Waterway Engineering, No. 11, 31-34.

[2]   Lv, J.-Y., Wang, Y.-A. and Yu, G.N. (2010) Navigation Condition during Construction Period of Yilan Power Junction in Songhua River. Journal of Waterway and Harbor, No. 6, 604-608.

[3]   Yin, C.-Q., Liu, F.-Z. and Zhang, Z. (2013) Test Study on Navigation in Construction Period of Longxikou Navigation-Power Junction on Min River. Port &Waterway Engineering, No. 1, 114-120.

[4]   Chen, Y.-Y., Hu, X.-W. and Peng, K. (2012) Navigation during Regulation of Tail Water Level of Shuikou Hydroelectric Station. Port &Waterway Engineering, No.1, 83-87.

[5]   Chao, D.H. (1997) The Applications and Study of Numerical Simulation of Turbulence Flow with Free Surface in Hydraulic Spillway Structure. Journal of Hydrodynamics, No. B4, 54-59.

[6]   Weng, Y.H., Xie, X.R. and Fan, W.Y. (2011) The Construction Design and Practice of Three Gorges Project. Engineering Sciences, No. 3, 96-103.

[7]   Yang, Y., Peng, B. and Dong, X.-R. (2011) Performance Evaluation Method of Hybrid Navigation Constellations with Invalid Satellites. Science China (Physics, Mechanics & Astronomy), 54, 1046-1050.
http://dx.doi.org/10.1007/s11433-011-4344-7

[8]   Li, Z.-J., Zhang, G.-L. and Sun, G.-H. (2014) On Construction Diversion and Cofferdam Scheme of Ship Lock Reconstruction Project on Fuchunjiang River. Port & Waterway Engineering, No. 10, 115-120.

[9]   Li, Y., Zhou, H.-X. and Zheng, B.-Y. (2004) Model Test on Diversion Works in Construction of Naji Hydro-Junction. Journal of Waterway and Harbor, No. 3, 145-149.

 
 
Top