Back
 ENG  Vol.8 No.3 , March 2016
Review of Oil and Gas Development Life Cycle Project Management (LCPM)
Abstract: The effective implementation of the project management plays a core roll in avoiding bad project use effect and waste of funds, caused by asset management planning and design errors or equipment selection errors; meanwhile, it can effectively improve the operational efficiency of enterprise assets, lower operating costs and save resources. In June 1974, A. Gordon published a paper “3L Economics Concept” as the starting point, on the “Building and Quantity Surveying”, which is organized by the Royal Institution of Chartered Surveyors. In this paper, a review of domestic and foreign research, from 1974 to 2015, on the total life cycle management progress will be given, and then a comment on it will be established. After detailed investigation and analysis of related materials, we can draw a conclusion: the study of the oil and gas development project lifecycle management is just beginning now. Hence, building the whole life cycle planning index system in line with the characteristics of oil and gas development project is very necessary.
Cite this paper: Yan, Y. and Liu, H. (2016) Review of Oil and Gas Development Life Cycle Project Management (LCPM). Engineering, 8, 74-78. doi: 10.4236/eng.2016.83009.
References

[1]   Gordon, A. (1974) The Economic of the 3L’5 Concept. Charted Survey or Building and Quantity Surveying.

[2]   America Institute of Architects (1997) Life Cycle Cost Analysis: A Guide for Architects. AIA, USA.

[3]   Orshan, O. (1980) Life Cycle Cost: A Tool for Comparing Building Alternative. Proceeding Symposium on Quality and Cost in Building, 1, 63.

[4]   Bull, J.W. (1993) The Way Ahead for Life Cycle Costing in the Construction Industry. In: Bull, J.W., Ed., Life Cycle Costing for Construction, Blackie Academic & Professional, Glasgow.

[5]   Wyley, W.J., Petts, R.C. and Brooks, J. (1986) Evaluation of the World Bank’s Highway Design and Maintenance Standards Model on United Kingdom Highways.

[6]   Jaafari, A. (2001) Management of Risks, Uncertainties and Opportunities on Projects: Time for a Fundamental Shift. International Journal of Project Management, 19, 89-101.
http://dx.doi.org/10.1016/S0263-7863(99)00047-2

[7]   Kerzner, H. (2001) Project Management; Systems Approach to Planning, Scheduling and Controlling. John Wesley and Sons, New York.

[8]   Bull, J.W. (2003) Life Cycle Costing for Construction. Routledge, Abingdon-on-Thames.

[9]   Medley Sr., L.G. (1996) The Life-Cycle Perspective: Managing Cost before It Occurs. Cost Engineering-Morgantown, 38, 35-39.

[10]   Jaafari, A. (1997) Concurrent Construction and Life Cycle Project Management. Journal of Construction Engineering and Management, 123, 427-436.
http://dx.doi.org/10.1061/(ASCE)0733-9364(1997)123:4(427)

[11]   Tsai, W.H., Yang, C.H., Chang, J.C., et al. (2014) An Activity-Based Costing Decision Model for Life Cycle Assessment in Green Building Projects. European Journal of Operational Research, 238, 607-619.
http://dx.doi.org/10.1016/j.ejor.2014.03.024

[12]   Batselier, J. and Vanhoucke, M. (2015) Construction and Evaluation Framework for a Real-Life Project Database. International Journal of Project Management, 33, 697-710.
http://dx.doi.org/10.1016/j.ijproman.2014.09.004

[13]   Qi, A.B. (2000) Project Total Cost Management. Nankai University Press, Tianjin. (In Chinese)

[14]   Qi, A.B. (2001) Modern Project Management. Foreign Economic and Trade University Publishing House, Beijing. (In Chinese)

[15]   Qi, A.B. (2010) Project Risk Management. Nankai University Press, Tianjin. (In Chinese)

[16]   Ding, S.Z. (1999) Discussion on Establishment of Project Life Management System—A New General Conception of Management Systems Integrated with DM, PM and FM. Construction Supervision Institute of Tongji University, Shanghai. (In Chinese)

[17]   He, Q.H. and Chen, F.B. (2001) Study of Integrated Management Model Construction on Life Cycle Project. Journal of Chongqing Construction University, 23. (In Chinese)

[18]   Zeng, C., Wang, A.M. and Xiao, T.Y. (2005) Total Life Cycle Project Management System Analysis and Design. Computer Engineering and Design, 26, 853-856. (In Chinese)

[19]   Liu, Y.Q., Qi, A.B. and Yang, Y.W. (2008) Research on Total Life Cycle Project Management Method of Government Investment Project Agent Enterprise. Proceedings of the 10th Annual Meeting of China Association for Science and Technology, 4. (In Chinese)

[20]   Li, Y.F. and Qi, A.B. (2010) Engineering Project Risk Management System Problem and Countermeasure Analysis. Project Management Techniques, 2, 79-82. (In Chinese)

[21]   Lei, Z.Y. and Hu, W.S. (2010) Construction of Later Comprehensive Evaluation Index System of Oil and Gas Field Development Project. Journal of Oil and Gas, 10, 391-393. (In Chinese)

[22]   Qi, Y.P. (2011) Oil and Gas Field Development Project Management Evaluation Research Based on the Fuzzy Comprehensive Evaluation. Project Management Techniques, 5, 96-100. (In Chinese)

[23]   Liu, B. (2012) Total Life Cycle of Project Economic Evaluation Method. International Petroleum Economy, 7, 65-67. (In Chinese)

[24]   Luo, L.R., Chen, C.-Y. and Wang, J. (2013) Follow-Up Assessment of Oil and Gas Life Cycle Project Construction. Natural Gas Technology and the Economy, 7, 51-53. (In Chinese)

[25]   Ding, H. (2014) Project Management System Construction Based on Total Life Cycle. Electric Power, 12. (In Chinese)

[26]   Xue, J. and Wu, Q. (2014) The Establishment of the Total Life Cycle of Project Risk Management Model and Its Application. Journal of Northwestern Polytechnical University: Social Science Edition, 34, 44-49. (In Chinese)

[27]   Chi, H.J. (2014) Total Life Cycle Project Management of China’s Oil and Gas Pipeline. International Petroleum Economy, 22, 86-91. (In Chinese)

 
 
Top