Impacts of the Financial Factors on Schedule Delays Risk of the International Contracting Projects: Evidence from Highway BOT Pro-jects in Vietnam
Abstract: Vietnam has become a major market for construction enterprises from East Asian countries, especially from China, to participate in international project contracting, but serious schedule delays have important adverse effects on local government and foreign investment companies. Based on international engineering contracting mode of Vietnam highway BOT construction projects, we discussed the drive financial factors of schedule delays, using the methods of exploratory factor analysis and questionnaire survey, and evaluated the effects of various factors which are through regression analysis. The empirical results show that the five categories of financial factors, including the policy change, slow payment, financial mismanagement, financial market changes and lack of fiscal, have significant effects on schedule delay. Furtherly, we suggested that strengthening policy research and improving financial management ability should be used to reduce the influence of relevant financial factors on schedule delay, to improve the profitability of international businesses and the motivation of foreign enterprises to participate in Vietnam highway project.
Cite this paper: Vu, H. , Wang, J. , Min, L. and Nguyen, T. (2015) Impacts of the Financial Factors on Schedule Delays Risk of the International Contracting Projects: Evidence from Highway BOT Pro-jects in Vietnam. World Journal of Engineering and Technology, 3, 311-319. doi: 10.4236/wjet.2015.34030.
References

[1]   Long, N.D., Ogunlana, S., Quang, T. and Lam, K.C. (2004) Large Construction Projects in Developing Countries: A Case Study from Vietnam. International Journal of project management, 22, 553-561.
http://dx.doi.org/10.1016/j.ijproman.2004.03.004

[2]   Le-Hoai, L., Dai Lee, Y. and Lee, J.Y. (2008) Delay and Cost Overruns in Vietnam Large Construction Projects: A Comparison with Other Selected Countries. KSCE Journal of Civil Engineering, 12, 367-377.
http://dx.doi.org/10.1007/s12205-008-0367-7

[3]   Assaf, S.A. and Al-Hejji, S (2006) Causes of Delay in Large Construction Projects. International Journal of Project Management, 24, 349-357.
http://dx.doi.org/10.1016/j.ijproman.2005.11.010

[4]   Aibinu, A.A. and Jagboro, G.O. (2002) The Effects of Construction Delays on Project Delivery in Nigerian Construction Industry. International Journal of Project Management, 20, 593-599.
http://dx.doi.org/10.1016/S0263-7863(02)00028-5

[5]   Abdul-Rahman, H., Wang, C., Takim, R. and Wong, S. (2011) Project Schedule Influenced by Financial Issues: Evidence in Construction Industry. Scientific Research and Essays, 6, 205-212.

[6]   Faridi, A.S. and El-Sayegh, S.M. (2006) Significant Factors Causing Delay in the UAE Construction Industry. Construction Management and Economics, 24, 1167-1176.
http://dx.doi.org/10.1080/01446190600827033

[7]   Frimpong, Y. and Oluwoye, J. (2003) Significant Factors Causing Delay and Cost Overruns in Construction of Groundwater Projects in Ghana. Journal of Construction Research, 4, 175-187.
http://dx.doi.org/10.1142/S1609945103000418

[8]   Toor, S.U.R. and Ogunlana, S.O. (2008) Problems Causing Delays in Major Construction Projects in Thailand. Construction Management and Economics, 26, 395-408.
http://dx.doi.org/10.1080/01446190801905406

[9]   Alaghbari, W., Kadir, M.R.A., and Salim, A. and Ernawati (2007) The Significant Factors Causing Delay of Building Construction Projects in Malaysia. Engineering, 14, 192-206.

[10]   Thi, C.H. and Swierczek, F.W. (2010) Critical success Factors in Project Management: Implication from Vietnam. Asia Pacific Business Review, 16, 567-589.
http://dx.doi.org/10.1080/13602380903322957

[11]   Luu, M.H. (2009) Factors Affecting Risks of Construction Projects in Vietnam. Maastricht School of Management, Maastricht, The Netherlands.

[12]   Ma, D.G. and Li, M.F. (2009) Early-Warning Model of Chinese Currency Crisis and Its Empirical Analysis—Correction and Application Based on the Research of the Factor—Logistic Model. Journal of Shanxi University (Philosophy and Social Science Edition), 32, 83-89.

[13]   Alzahrani, J.I. and Emsley, M.W. (2013) The Impact of Contractors’ Attributes on Construction Project Success: A Post Construction Evaluation. International Journal of Project Management, 31, 313-322,
http://dx.doi.org/10.1016/j.ijproman.2012.06.006

[14]   Fugar, F.D.K. and Agyakwah-Baah, A.B. (2010) Delays in Building Construction Projects in Ghana. Australasian Journal of Construction Economics & Building, 10, 103-116.
http://dx.doi.org/10.5130/ajceb.v10i1/2.1592

[15]   Abdul-Rahman, H., Takim, R. and Min, W.S. (2009) Financial-Related Causes Contributing to Project Delays. Journal of Retail & Leisure Property, 8, 225-238.
http://dx.doi.org/10.1057/rlp.2009.11

[16]   Bollen, K.A. (1998) Structural Equation Models. John Wiley & Sons, Ltd.

 
 
Top