Study on Effect of UHV Power Grid Construction Schemes on Short Circuit Current
Abstract: The commissioning of Southern Hami-Zhengzhou ±800 kV UHVDC transmission project has important significance to heighten operation reliability, transfer capability and supply electric ability of Henan power grid. However, short circuit currents of 500 kV buses in the Center of Henan are almost close to the operation upper limitation. In order to decrease the short circuit currents effectively, it’s necessary to strengthen the network structure of Center of Henan power grid and calculate short circuit currents. Two schemes of strengthening the network structure of Center of Henan power grid are studied. The calculated values of short circuit currents of some important 500 kV buses in the two schemes are still bigger than excepted. According to the latest Plan of State Grid, Yubei UHV substation and Zhumadian UHV substation located in Henan power grid. The calculated values of short circuit currents of some important 500 kV buses with the commissioning of Yubei UHV and Zhumadian UHV are qualified. So, reasonable network structure with UHV is suitable to heighten transfer capability and supply electric ability of Henan power grid.
Cite this paper: Li, Z. , Gao, F. , Wang, Q. , Zhang, S. , Luo, H. and Liang, J. (2015) Study on Effect of UHV Power Grid Construction Schemes on Short Circuit Current. Journal of Power and Energy Engineering, 3, 200-205. doi: 10.4236/jpee.2015.34028.
References

[1]   National Power Dispatching and Communication Center (2009) The Report about Research Special Projects Such as Short Circuit Current, Electromagnetic Loop Network and Transmission Capacity Is Low. State Grid Corporation of China, 11. (In Chinese)

[2]   Tang, X.J., Li, Z.H., Wu, L.H., et al. (2011) Investigation and Analysis on Short Circuit Current. China Electric Power Research Institute, 06. (In Chinese)

[3]   IEC 60909-0:2001 (2001) Short Circuit Currents in Three-Phase Acsystems—Part 0: Calculation of Currents. 07.

[4]   IEEE Standard 241-1990 (1990) Electric Power Systems in Commercial Buildings.

[5]   Luo, H.M., Tang, X.J., Li, X.J., et al. (2012) Research on the Adaptability of Structural Strength before and after Commissioning of the Large Capacity Hami-Zhengzhou UHVDC Project. China Electric Power Research Institute. 09. (In Chinese)

[6]   State Economic and Trade Commission of the People’s Republic of China (2001) Guide on Security and Stability for Power System (DL 755-2001).

[7]   Li, Z.H. (2012) Research on Thevenin Equivalent Parameters Based on Time Domain Simulation. China Electric Power Research Institute, 12. (In Chinese)

 
 