[1] Ofori, G. (1990) The Construction Industry: Aspects of Its Economics and Management. Singapore University Press, Singapore.
[2] Dlungwana, W.S. and Rwelamila, P.D. (2005) Contractor Development Models for Promoting Sustainable Building— A Case for Developing Management Capabilities of Contractors. Proceedings of the 2005 World Sustainable Building Conference, Tokyo, 27-29 September 2005, 4208-4215.
[3] Windapo, A. and Cattell, K. (2011) Research Report: Mapping the Path to Becoming a Grade 9 Contractor. University of Cape Town, Cape Town.
[4] Hauptfleisch, D., Lazarus, S., Knoetze, T. and Liebenberg, S. (2007) An Integrated Emerging Contractor Development Model for the Construction Industry: Practical Implementation and Statistical Quantification.
http://researchspace.Csir.co.za/dspace/bitstream/10204/1850/1/Hauptfleisch_2007
[5] Buys, F. and Ludwaba, D. (2012) The Potential of Built-Environment Professionals’ Contribution towards Emerging Contractor Development. ACTA Structilia, 19, 74-89
[6] Kaplan, R.S. and Norton, D.P. (1992) The Balanced Scorecard Measures That Drive Performance. Havard Business Review, 70, 71-79. https://hbr.org/2005/07/the-balanced-scorecard-measures-that-drive-performance
[7] Greyling, E. (2012) Opportunities for Employment Creation through SME Development in the Construction Sector, Free State. International Labour Organisation, Pretoria.
[8] MAIA Intelligence (2009) KPIs for Construction Industry.
http://maia-intelligence.com/kpis-for-construction-industry/
[9] Hancott, D.E. (2005) The Relationship between Transformational Leadership and Organisational Performance in the Largest Public Companies in Canada. Doctoral Dissertation. Capella University, Minneapolis.
[10] Akbaba, A. (2012) Business Performance of Small Tourism Enterprises: A Comparison among Three Sub-Sectors of the Industry. An International Journal of Tourism and Hospitality Research, 23, 177-195.
http://dx.doi.org/10.1080/13032917.2012.662907
[11] Reijonen, H. and Komppula, R. (2007) Perception of Success and Its Effect on Small Firm Performance. Journal of Small Business and Enterprise Development, 14, 689-701.
http://dx.doi.org/10.1108/14626000710832776
[12] Venkatraman, N. and Ramanujam, V. (1986) Measurement of Business Performance in Strategy Research: A Comparison of Approaches. Academy of Management Review, 11, 801-814.
[13] Murphy, G.B., Trailer, J.W. and Hill, R.C. (1996) Measuring Performance in Entrepreneurship Research. Journal of Business Research, 36, 15-23.
http://dx.doi.org/10.1016/0148-2963(95)00159-X
[14] Thomas, S.N., Palaneeswaran, E. and Kumaraswamy, M.M. (2002) A Dynamic E-Reporting System for Contractors’ Performance Appraisal. Advances in Engineering Software, 33, 339-349.
http://dx.doi.org/10.1016/S0965-9978(02)00042-X
[15] Keats, B.W. and Bracker, J.S. (1988) Toward a Theory of Small Firm Performance: A Conceptual Model. American Journal of Small Business, 12, 41-58.
[16] Santos, J.B. and Brito, L.A. (2012) Towards a Subjective Measurement Model for Firm Performance. Brazilian Administration Review, 9, 95-117.
http://dx.doi.org/10.1590/S1807-76922012000500007
[17] Cameron, K. (1986) A Study of Organizational Effectiveness and Its Predictors. Management Science, 32, 87-112.
http://dx.doi.org/10.1287/mnsc.32.1.87
[18] Cho, H. and Pucik, V. (2005) Relationship between Innovativeness, Quality, Growth, Profitability and Market Value. Strategic Management Journal, 26, 555-575.
http://dx.doi.org/10.1002/smj.461
[19] Glick, W.H., Washburn, N.T. and Miller, C.C. (2005) The Myth of Firm Performance. Proceedings of the Annual Meeting of American Academy of Management, Honolulu, 5-10 August 2005.
[20] Kagioglou, M., Cooper, R. and Aouad, G. (2001) Performance Management in Construction: A Conceptual Framework. Construction Management and Economics, 19, 85-95.
http://dx.doi.org/10.1080/01446190010003425
[21] Faridi, A. and El-Sayegh, S. (2006) Significant Factors Causing Delay in the UAE Construction Industry. Construction Management and Economics, 24, 1167-1176.
http://dx.doi.org/10.1080/01446190600827033
[22] Kotler, P. and Keller, K.L. (2006) Marketing Management. 12th Edition, Pearson Prentice Hall, Upper Saddle River.
[23] Marx, H.J. (2012) Construction Industry Indicators Affecting Contractors. Journal for the Advancement of Performance Information and Value, 4, 119-132.
[24] Brush, C.G. and Vanderwerf, P. (1992) A Comparison of Methods and Sources of Obtaining Estimates of New Venture Performance. Journal of Business Venturing, 7, 157-170.
http://dx.doi.org/10.1016/0883-9026(92)90010-O
[25] Wickham, P.A. (2001) Strategic Entrepreneurship: A Decision-Making Approach to New Venture Creation and Management. 2nd Edition, Financial Times/Prentice Hall, London.
[26] Luk, S.T.K. (1996) Success in Hong Kong: Factors Self-Reported by Successful Small Business Owners. Journal of Small Business Management, 34, 68-74.
[27] Harter, J.K., Schmidt, F.L. and Hayes, T. (2002) Business Unit Level Relationship between Employee Satisfaction: A Meta-Analysis. Journal of Applied Psychology, 87, 268-279.
http://dx.doi.org/10.1037/0021-9010.87.2.268
[28] Chakravarthy, B.S. (1986) Measuring Strategic Performance. Strategic Management Journal, 7, 437-458.
http://dx.doi.org/10.1002/smj.4250070505
[29] Waddock, S.A. and Graves, S.B. (1997) The Corporate Performance—Financial Performance Link. Strategic Management Journal, 18, 303-319.
http://dx.doi.org/10.1002/(SICI)1097-0266(199704)18:4<303::AID-SMJ869>3.3.CO;2-7
[30] Liu, A.M.M. and Walker, A. (1998) Evaluation of Project Outcomes. Construction Management and Economics, 16, 209-219.
http://dx.doi.org/10.1080/014461998372493