[1] Egyptian Railways (2005) Diagnosis of the Present Situation and Restructuring Strategy (August 2005).
[2] El-Sayed Al-Tony, F. and Abdelkader Lashina (2000) Cost-Benefict Analysis of Railway. Electrification: Case Study for Cairo-Alexandria Railway Line. Impact Assessment and Project Appraisal, 18, 323-333.
http://dx.doi.org/10.3152/147154600781767312
[3] The World Bank (2005) Restructuring Egypt Railways, Egypt Public Expenditure, Policy Note 4, Review August 2005.
[4] Deborah Matherly: Egypt Railway Study (2009) Technical Assistance for Safety Improvements AND RAIL Traffic Management. Transportation research Board of the National Academies, Nr. 15, 13.
[5] Egypt State Information Service (2007) Year Book (2007).
[6] The World Bank (2009) Egyptian National Railways Restructuring Project Report, Report No: AB2433, February 26, 2009.
[7] (2008) Report of the Environmental Impact Assessment. May 2008.
[8] CAPMAS (2012) Central Agency for Population Mobilization and Statistics. Population Estimates by Sex & Generate 1/1/2012, Egypt in Figures 2012, March 2012.
[9] Description of Egypt in Numbers (2007) Publication of the Information and Decision Support Center, Cabinet of Ministers.
[10] Ali, S.A. (2004) Investigation of the Dose-Response Relationship for Road Traffic Noise. Department of Architecture, Faculty of Engineering, Assiut University, Assiut, Egypt Applied Acoustics, in press Egyptian Environmental Law No. 4. Egyptian Ministry of Environment, Cairo, Egypt, 1994.