[1] Wan, J.P. and Pan, G.W. (2014) Top 10 Key Risk Factors of GZA Project Implementation are Identified with Analytic Hierarchy Process. Open Journal of Business and Management, 2, 172-179.
http://dx.doi.org/10.4236/ojbm.2014.23021
[2] 233 Network School (2008) The Classification and Characteristics of Engineering Project Risk Management and Countermeasures.
http://www.233.com/jzs1/xmgl/fudao/20080922/085417974.html
[3] Zhao, Z.Y., Liu, Y.S. and Yang, H.C. (2002) Application of Fault Tree Analyzing Method to Risk Management of a Construction Project. Modern Electric Power, 19, 95-99.
[4] Guo, P. and Shi, P.G. (2005) Research on Fuzzy-Grey Comprehensive Evaluation Method of Project Risk. Journal of Xi’an University of Technology, 21, 106-109.
[5] Zhao, H. and Yin, Y.L. (2011) An Analysis of Influencing Factors of Reasonable Risk Allocation in Construction Project Based on Interpretative Structural Modeling, Journal of Beijing Institute of Technology (Social Sciences Edition), 13, 15-19.
[6] Warfield, J.N. (1976) Societal Systems: Planning, Policy, and Complexity, Wiley Interscience, New York, 208-366.
[7] Cheng, B. (2010) Empirical Analysis on the Capability of Our Entrepreneures Factors Based on ISM. Mathematics in Practice and Theory, 40, 71-79.
[8] Wan, J.P. and Hou, J.J. (2012) Research on SAP Business One Implementation Risk Factors with Interpretive Structural Model. Journal of Software Engineering and Applications, 5, 147-155.
http://dx.doi.org/10.4236/jsea.2012.53022
[9] Wan, J.P., Cao, Y.H. and Hou, J.J. (2013) Case Study on H Corp. Software Project Risk Management with ISM. Technology and Investment, 4, 145-152. http://dx.doi.org/10.4236/ti.2013.43017
[10] Wan, J.P., Zhu, Y.H. and Liang, L.Y. (2013) The Research on the Key Success Factors of Mobile Internet with Interpretative Structural Modeling. iBusiness, 5, 107-112.