Abstract: This paper examines the results of the distributed generation penetration in large-scale medium-voltage power distribution networks. The network examined as a study case consists of twenty one lines fed by three power substations. The injected power comes mainly from photovoltaic units. Specifically, the influences of distributed generation on the network branch currents, losses and voltage profile as well as on the short-circuit level at the medium voltage busbars of the infeeding substations are examined according to international and national standards. The arising problems are explored and technical solutions are proposed. This paper is a pilot application as general conclusions concerning the extended distributed generation penetration in real power distribution networks are set out.
Cite this paper: A. Safigianni, G. Koutroumpezis and A. Spyridopoulos, "Distributed Generation Effects on Large-Scale Distribution Networks," Engineering, Vol. 6 No. 1, 2014, pp. 34-41. doi: 10.4236/eng.2014.61006.
References

[1]   T. Ackermann, G. Andersson and L. Soder, “Distributed Generation: A Definition,” Electric Power Systems Research, Vol. 57, No. 3, 2001, pp. 195-204.
http://dx.doi.org/10.1016/S0378-7796(01)00101-8

[2]   A. Wallace and G. Harrison, “Planning for Optimal Accommodation of Dispersed Generation in Distribution Networks,” Proceedings of the CIRED 17th International Conference on Electricity Distribution, Barcelona, May 2003, 6 p.

[3]   A. Bhowmik, A. Maitra, S. M. Halpin and J. E. Schatz, “Determination of Allowable Penetration Levels of Distributed Generation Resources Based on Harmonic Limit Considerations,” IEEE Transactions on Power Delivery, Vol. 18, No. 2, 2003, pp. 619-624.
http://dx.doi.org/10.1109/TPWRD.2003.810494

[4]   A. Keane and M. O’Malley, “Optimal Allocation of Embedded Generation on Distribution Networks,” IEEE Transactions on Power Systems, Vol. 20, No. 3, 2005, pp. 1640-1646.
http://dx.doi.org/10.1109/TPWRS.2005.852115

[5]   G. Celli, E. Ghiani, S. Mocci and F. Pilo, “A Multi-Objective Evolutionary Algorithm for the Sizing and Siting of Distributed Generation,” IEEE Transactions on Power Systems, Vol. 20, No. 2, 2005, pp. 750-757.
http://dx.doi.org/10.1109/TPWRS.2005.846219

[6]   G. N. Koutroumpezis, A. S. Safigianni, G. S. Demetzos and J. G. Kendristakis, “Investigation of the Distributed Generation Penetration in a Medium Voltage Power Distribution Network,” International Journal of Energy Research, Vol. 34, No. 7, 2010, pp. 585-593.

[7]   G. N. Koutroumpezis and A. S. Safigianni, “Optimum Allocation of the Maximum Possible Distributed Generation Penetration in a Distribution Network,” Electric Power Systems Research, Vol. 80, No. 12, 2010, pp. 1421-1427. http://dx.doi.org/10.1016/j.epsr.2010.06.005

[8]   B. Kuri, M. Redfern and F. Li, “Optimization of rating and positioning of dispersed generation with minimum network disruption,” Proceedings of the IEEE Power Engineering Society General Meeting, Denver, June 2004, pp. 2074-2078.

[9]   K. Nara, Y. Hayashi, K. Ikeda and T. Ashizawa, “Application of Tabu Search to Optimal Placement of Distributed Generators,” Proceedings of the IEEE Power Engineering Society Winter Meeting, 2001, pp. 918-923.

[10]   G. Celli and F. Pilo, “Optimal Distributed Generation Allocation in MV Distribution Networks,” Proceedings of the 22nd IEEE PES International Conference on Power Industry Computer Applications PICA, Sydney, 20-24 May 2001, pp. 81-86.

[11]   K. H. Kim, Y. J. Lee, S. B. Rhee, S. K. Lee and S. K. You, “Dispersed Generator Placement Using Fuzzy-GA in Distribution Systems,” Proceedings of the IEEE Power Engineering Society Summer Meeting, Chicago, 21-25 July 2002, pp. 1148-1153.
http://dx.doi.org/10.1109/PESS.2002.1043458

[12]   W. El-Khaltam, K. Bhattacharya, Y. Hegazy and M. M. A. Salama, “Optimal Investment Planning for Distributed Generation in a Competitive Electricity Market,” IEEE Transactions on Power Systems, Vol. 19, No. 3, 2004, pp. 1674-1684. http://dx.doi.org/10.1109/TPWRS.2004.831699

[13]   http://www.neplan.ch/html/e/e_home.htm

[14]   European Norm EN 50160: Voltage Characteristics of Electricity Supplied by Public Distribution Systems, CENELEC, 1999.

[15]   S. A. Papathanassiou, “A Technical Evaluation Framework for the Connection of DG to the Distribution Network,” Electric Power Systems Research, Vol. 77, No. 1, 2007, pp. 24-34.
http://dx.doi.org/10.1016/j.epsr.2006.01.009

[16]   Technical Requirements for the Connection of Independent Generation to the Grid, Public Power Corporation (PPC), Greece, 2004.

[17]   IEC 60909-0: Short-Circuit Currents in Three-Phase a.c. Systems, Parts 0-4, 2002.

[18]   T. Boutsika and S. A. Papathanassiou, “Short Circuit Calculations in Networks with Distributed Generation,” Electric Power Systems Research, Vol. 78, No. 7, 2008, pp. 1181-1191.
http://dx.doi.org/10.1016/j.epsr.2007.10.003

 
 
Top