Back
 JWARP  Vol.3 No.2 , February 2011
Study on Factors Influencing the Reliability of the Organization Management Chain of the Large and Medium-Sized Project in the Construction Period
Abstract: On the basis of analyzing the reliability of the organization’ management chain of the large and medium- sized project in the construction period, the paper studies the factors influencing the reliability of the organi-zation management chain, which, corresponding to four elements of management chain – “Management Loop”, “Management Link”, “Management Chain”, and “Management Network”, can be summarized as project main body, interface management, connection sequence and management model. The paper then re-searches on the specific influencing factors from the above-mentioned four aspects.
Cite this paper: nullJ. Feng, Y. Qian, Z. Liu and H. Li, "Study on Factors Influencing the Reliability of the Organization Management Chain of the Large and Medium-Sized Project in the Construction Period," Journal of Water Resource and Protection, Vol. 3 No. 2, 2011, pp. 131-139. doi: 10.4236/jwarp.2011.32016.
References

[1]   J. C. Feng, et al., “Reliability Model of Organization Management Chain of South-to-North Water Diversion Project during Construction Period,” Water Science and Engineering, Vol. 1, No. 4, June 2008, pp. 107-113.

[2]   W. U. Limin, “The Discussion on Theory of Management Chain,” Journal of Wuhan Polytechnic University, Vol. 22, No. 4, 2003, pp. 83-85.

[3]   B. Guo, et al., “System Reliability Analysis,” Defence Science University Press, Changsha, 2002.

[4]   C. H. Chen, et al., “Construction of the Supply Chain Based on the Reliability,” Industrial Engineering and Management, Vol. 9, No. 1, 2004, pp. 72-74.

[5]   B. Z. Du, “The Understanding of the Project Delegating Construction Management Model in South-to-North Water Diversion Project,” Hebei Water Resources and the South-to-North Water Diversion, No. 4, 2008, pp. 1-2.

[6]   Mid-South Design & Research Institute, Hohai University, “Contract Project Management Theory and Practice,” China WaterPower Press, Beijing, 2009.

[7]   Z. F. Yu, et al., “Project Organization,” Tsinghua University Press, Beijing, 2000.

[8]   W. Z. Gao, “The Research on Characteristics of Organizational Culture Systems,” Market Modernization, No. 5, 2006, pp. 86-87.

[9]   E. Schein, “Organization Culture,” American Psychologist, Vol. 9, No. 2, 1990, pp. 45-53.

[10]   T. Jing, “Potential Risks and Countermeasures of Subway Project Interface Management,” Sichuan Building, No. 5, 2006, pp. 181-184.

[11]   M. Li, “Interface Management in Construction Project,” Optimization of Capital Construction, Vol. 27, No. 5, 2006, pp. 32-34.

[12]   Y. Qi, “The Research on Key-Indexes-Oriented Interface Management System of Nuclear Power Plant Project,” Harbin Engineering University, Harbin, 2008.

[13]   Q. H. Zhao, “The Administrative Supervision of Construction Works Contract,” Construction Management Modernization, No. 3, 2001, pp. 32-34.

[14]   S. X. Luo, et al., “The Research on Project Coordination Management,” Value Engineering, No. 7, 2008, pp. 131- 134.

[15]   H. Yu, “On the Government Regulation in Administrative Reform,” Jianghai Academic Journal, No. 1, 2004, pp. 76-79.

[16]   B. Sun, “The Research on Supervision Mode of Major National Projects,” Hohai University, Nanjing, 2003.

 
 
Top