AJIBM  Vol.3 No.5 , September 2013
A Fuzzy Multicriteria Grade Cluster Analysis for the Budget Allocation of Tourism and Leisure Resources
ABSTRACT
The fuzzy multicriteria grade cluster analysis model put forward by this study can objectively deal with the need priorities of tourism and leisure resources so the budget is allocated first to the projects which are in urgent need of money. Thus, the following situation can be avoided: in the traditional budget allocation of tourism and leisure resources, the tourism and leisure project submitted by all units are not partitioned off according to their different need grades but unfairly mixed together in evaluation, leaving the projects at high need grade unable promptly to obtain funds.

Cite this paper
M. Lin and J. Teng, "A Fuzzy Multicriteria Grade Cluster Analysis for the Budget Allocation of Tourism and Leisure Resources," American Journal of Industrial and Business Management, Vol. 3 No. 5, 2013, pp. 488-496. doi: 10.4236/ajibm.2013.35056.
References
[1]   R. E. Bellman and L. A. Zadeh, “Decision-Making in a Fuzzy Environment,” Management Science, Vol. 17, No. 4, 1970, pp. 141-164. doi:10.1287/mnsc.17.4.B141

[2]   S. M. Baas and H. Kwakernaak, “Rating and Ranking of Multiple Aspect Alternative Using Fuzzy Sets,” Automatica, Vol. 13, No. 1, 1997, pp. 47-58. doi:10.1016/0005-1098(77)90008-5

[3]   S. J. Chen and C. L. Hwang, “Fuzzy Multiple Attribute Decision Making, Methods and Applications,” In: Lecture Notes in Economics and Mathematical Systems, Vol. 375, Springer, New York, 1993. doi:10.1016/0165-0114(85)90090-9

[4]   J. J. Buckley, “Fuzzy Hierarchical Analysis,” Fuzzy Sets and Systems, Vol. 17, No. 1, 1985, pp. 233-247.

[5]   G. H. Tzeng, T. A. Shiah and J. Y. Teng, “A Multiobjective Decision Making Approach to Energy Supply Mix Decisions in Taiwan,” Energy Sources, Vol. 16, No. 3, 1994, pp. 301-316. doi:10.1080/00908319408909080

[6]   J. Y. Teng and G. H. Tzeng, “Fuzzy Multicriteria Ranking of Urban Transportation Investment Alternatives,” Transportation Planning and Technology, Vol. 20, No. 1, 1996, pp. 15-31. doi:10.1080/03081069608717577

[7]   S. H. Tsaur, G. H. Tzeng and G. C. Wang, “Evaluating Tourist Risks from Fuzzy Perspectives,” Annals of Tourism Research, Vol. 24, No. 4, 1997, pp. 796-812. doi:10.1016/S0160-7383(97)00059-5

[8]   M. T. Tang, G. H. Tzeng and S. W. Wang, “A Hierarchy Fuzzy MCDM Method for Studying Electronic Marketing Strategies in the Information Service Industry,” Journal of International Information Management, Vol. 8, No. 1, 1999, pp. 1-22.

[9]   W. C. Huang, J. Y. Teng, M. J. Huang and M. S. Kuo, “Port Competitiveness Evaluation by Fuzzy Multicriteria Grade Classification Model,” Journal of Marine Science and Technology, Vol. 11, No. 1, 2003, pp. 53-60.

[10]   A. D. Pearman, “The Use of Multicriteria Techniques to Rank Highway Investment Proposals,” In: A. G. Lockett and G. Islei, Eds., Improving Decision Making in Organisations, Springer-Verlag, Berlin, 1989.

[11]   I. J. Azis, “Analytic Hierarchy Process in the Benefit-Cost Framework: A Post-Evaluation of the TransSumatra Highway Project,” European of Operational Research, Vol. 48, 1990, pp. 38-48. doi:10.1016/0377-2217(90)90059-K

[12]   K. M. Al-Subhi, “Application of the AHP in Project Management,” International Journal of Project Management, Vol. 19, No. 1, 2001, pp. 19-27. doi:10.1016/S0263-7863(99)00038-1

[13]   M. I. Al Khalil, “Selecting the Appropriate Project Delivery Method Using AHP,” International Journal of Project Management, Vol. 20, No. 6, 2002, pp. 469-474. doi:10.1016/S0263-7863(01)00032-1

[14]   S. W. Fong and S. K. Y. Choi, “Final Contractor Selection Using the Analytical Hierarchy Process,” Construction Management Economics, Vol. 18, No. 5, 2000, pp. 547-557. doi:10.1080/014461900407356

[15]   T. Y. Hsieh, S. T. Lu and G. H. Tzeng, “Fuzzy MCDM Approach for Planning and Design Tenders Selection in Public Office Buildings,” International Journal of Project Management, Vol. 22, No. 7, 2004, pp. 573-584. doi:10.1016/j.ijproman.2004.01.002

[16]   I. M. Mahdi, M. J. Riley, S. M. Fereig and A. P. Alex, “A Multi-Criteria Approach to Contractor Selection,” Engineering Construction and Architectural Management, Vol. 9, No. 1, 2002, pp. 29-37.

[17]   N. K. Kwak and C. B. Diminnie, “A Programming Model for Allocating Operating Budgets of Academic Units,” Socio-Economic Planning Sciences, Vol. 21, No. 5, 1987, pp. 333-339. doi:10.1016/0038-0121(87)90007-3

[18]   L. Sundberg and G. Carlen, “Allocation Mechanisms in Public Provision of Transport and Communication Infrastructure,” Regional Science, Vol. 23, No. 4, 1989, pp. 311-327. doi:10.1007/BF01579782

[19]   R. Ramanathan and L. S. Ganesh, “Using AHP for Resource Allocation Problems,” European Journal of Operational Research, Vol. 80, No. 2, 1995, pp. 410-417. doi:10.1016/0377-2217(93)E0240-X

[20]   Y. H. Perng, Y. K. Juan and H. S. Hsu, “Genetic Algorithm-Based Decision Support for the Restoration Budget Allocation of Historical Buildings,” Building and Environment, Vol. 42, No. 2, 2007, pp. 770-778. doi:10.1016/j.buildenv.2005.09.009

[21]   Y. Han, X. Wu and C. Yue, “Optimizing Financial Budget for Software Implementation Based on the Development Effort and Cost Function,” Advances in Engineering Software, Vol. 36, No. 10, 2005, pp. 699-706. doi:10.1016/j.advengsoft.2004.10.001

[22]   D. M. Karydas and J. F. Gifun, “A Method for the Efficient Prioritization of Infrastructure Renewal Projects,” Reliability Engineering & System Safety, Vol. 91, No. 1, 2006, pp. 84-99. doi:10.1016/j.ress.2004.11.016

[23]   D. A. Tommy and G. Donald, “Tourism as a Mixed Industry: Differences between Private, Public and Not-forProfit Festivals,” Tourism Management, Vol. 30, No. 6, 2009, pp. 847-856. doi:10.1016/j.tourman.2008.12.008

[24]   J. A. Puppim de Oliveira, “Governmental Responses to Tourism Development: Three Brazilian Case Studies,” Tourism Management, Vol. 24, No. 1, 2003, pp. 97-110. doi:10.1016/S0261-5177(02)00046-8

[25]   D. L. Davies and D. W. Bouldin, “A Cluster Separation Measure,” IEEE Transactions on Pattern Analysis and Machine Intelligence, Vol. 1, No. 2, 1979, pp. 224-227. doi:10.1109/TPAMI.1979.4766909

[26]   C. Bakewell and V. L. Mitchell, “Generation Y Female Consumer Decision-Making Style,” International Journal of Retail & Distribution Management, Vol. 31, No. 2-3, 2003, pp. 95-106. doi:10.1108/09590550310461994

[27]   P. R. Sparrow and K. Gaston, “Generic Climate Map: A Strategic Application of Climate Survey Data?” Journal of Organisational Behaviour, Vol. 17, No. 6, 1996, pp. 679-698. doi:10.1002/(SICI)1099-1379(199611)17:6<679::AID-JOB786>3.0.CO;2-M

[28]   D. J. Briggs and J. France, “Classifying Landscape and Habits for Regional Environmental Planning,” Journal of Environmental Management, Vol. 17, 1983, pp. 249-261.

[29]   J. F. Calvo, J. A. Palazon, M. A. Esteve, M. L. Suarez, A. Torres, M. R. Vidal-Abarca and L. Ramirez-Diaz, “The Use of Multivariate Analysis for the Ecological Characterization of Landscape: The Mula River Watershed, South-East Spain,” Journal of Environmental Management, Vol. 34, No. 4, 1992, pp. 297-308. doi:10.1016/S0301-4797(11)80005-8

[30]   SPSS, “SPSS 10 Syntax Reference Guide,” SPSS, Chicago, 1999.

[31]   G. W. Milligan, “An Examination of the Effect of Six Types of Error Perturbation on Fifteen Clustering Algorithms,” Psychometrika, Vol. 45, No. 3, 1980, pp. 325-342. doi:10.1007/BF02293907

 
 
Top