[1] M. Dixey, “Putting Reliability at the Center of Maintenance,” Professional Engineering, Vol. 6, No. 6, June 1993, pp. 23-25.
[2] S. A. Abdulrohim, O. D. Salih and A. Raouf, “RCM Concepts and Application: A Case Study,” International Journal of Industrial Engineering, Vol. 7, No. 2, 2000, pp. 123-132.
[3] J. Wang and J. Chu, “Selection of Optimum Maintenance Strategies Based on a Fuzzy Analytic Hierarchy Process,” International Journal of Production Economics, Vol. 107, No. 1, 2007, pp. 151-163.
[4] R. K. Sharma, D. Kumar and P. Kumar, “FLM to Select Suitable Maintenance Strategy in Process Industries Using MISO Model,” Journal of Quality in Maintenance Engineering, Vol. 11, No. 4, 2005, pp. 359-374.
[5] The National Aeronautics and Space Adminis-tration, “Reliability-Centered Maintenance Guide for Facilities and Collateral Equipment,” NASA, Washington D.C., February 2000.
[6] A. M. Smith, “Reliability-Centered Maintenance,” McGraw-Hill, New York, 1993.
[7] J. Shayeri, “Develop-ment of Computer-Aided Maintenance Resources Planning (CAMRP): A Case of Multiple CNC Machining Centers,” Ro-botics and Computer-Integrated Manufacturing, Vol. 23, No. 6, 2007, pp. 614-623.
[8] M. Rausand, “Reliability-Centered Maintenance,” Reliability Engineering and System Safety, Vol. 60, No. 2, 1998, pp. 121-132.
[9] A. H. Gomaa, “Maintenance Planning and Management,” A Literature Study, American University in Cairo, Cairo, 2003.