[1] H. K. Alfares, “An Efficient Two-Phase Algorithm for Cyclic Days-Off Scheduling,” Computers and Operations Research, Vol. 25, No. 11, 1998, pp. 913-924. doi:10.1016/S0305-0548(98)00033-1
[2] H. K. Alfares, “Efficient Optimization of Cyclic Labour Days-Off Scheduling,” OR Spectrum, Vol. 23, No. 2, 2001, pp. 283-294. doi:10.1007/PL00013353
[3] H. K. Alfares, M. T. Lilly and I. Emovon, “Maintenance Staff Scheduling at Afam Power Station,” Industrial Engineering and Management System, Vol. 6, No. 1, 2007, pp. 22-27.
[4] R. L. Fagbenle, “Prospects and Problems of Solarizing Transport Technology,” Nigerian Journal of Renewable Energy, Vol. 2, No. 1, 1991.
[5] H. K. Alfares, “Flexible 4-Day Workweek Scheduling with Weekend Work Frequency Constraints,” Computer and Industrial Engineering, Vol. 44, No. 3, 2003, pp. 325-338. doi:10.1016/S0360-8352(02)00192-4
[6] I. Emovon, “Optimization of Workforce Scheduling for Solving Maintenance Problem in a Power Station (A Case Study of Afam Thermal Power Station),” M.Tech. Thesis, Rivers State University of Science and Technology, Nigeria, 2007.