[1] G. J. Zietlow, “Cutting Costs and Improving Quality through Performance-Based Road Management and Maintenance Contracts-The Latin American and OECD Experiences,” Senior Road Executives Programme, Restructuring Road Management, German Development Cooperation, Birmingham, 2005.
[2] M. Frost and C. M. Lithgow, “Future Trends in Performance-Based Contracting-Legal and Technical Perspectives,” Proceedings of 19th ARRB Conference, Sydney, 7-11 December 1998, pp. 91-101.
[3] A. Straub, “Cost Savings from Performance-Based Maintenance Contracting,” International Journal of Strategic Property Management, Vol. 13, No. 3, 2009, pp. 205-217. doi:10.3846/1648-715X.2009.13.205-217
[4] P. C. Anastasopoulos, B. G. McCullouch, K. Gkritza, F. L. Mannering, and K. C. Sinha, “A Cost Savings Analysis of Performance-Based Contracts for Highway Maintenance Operations” Journal of Infrastructure Systems, Vol. 16, No. 4, 2010, pp. 251-263. doi:10.1061/(ASCE)IS.1943-555X.0000012
[5] G. J. Zietlow, “Performance-Based Road Management and Maintenance Contracts-Worldwide Experiences,” International Seminar on Road Financing and Investment, Arusha, 16-20 April 2007, pp. 1-76.
[6] N. Stankevich, N. Qureshi and C. Queiroz, “Performance- based Contracting for Preservation and Improvement of Road Assets,” The World Bank, Washington DC, 2005.
[7] G. J. Zietlow and A. Bull, “Performance Specified Road Maintenance Contracts—The Road to the Future, the Latin American Perspective,” 21st World Congress, Kuala Lumpur, 3-9 October 1999, pp. 1-6.
[8] P. Hardy, “Austroads Review of Performance Contracts: The Potential Benefits of Performance Contracts,” Opus International Consultants, Nelson, 2001.
[9] M. Frost and C. Lithgow, “Improving Quality and Cutting Costs through Performance Contracts-Australian Experience,” World Bank Road Management Training Seminar, Washington DC, 1996.
[10] B. Carpenter, E. Fekpe, and D. Gopalakrishna, “Performance-Based Contracting for the Highway Construction Industry, An Evaluation of the Use of Innovative Contracting and Performance Specification in Highway Construction,” Koch Industries Inc., Washington DC, 2003.
[11] Y. Mumseen, L. Johannes and G. Kumar, “Roads, Chapter 4, Output-Based Aid: Lessons Learned and Best Practices,” The World Bank, Washington DC, 2010.
[12] M. Keir and G. V. Blerk, “A Review of the Performance Specified Maintenance Contract (PSMC) Model Using a Case Study of PSMC 001, Case Study—Transit New Zealand,” Transfield Services, Sydney, 2006.
[13] E. Lancelot, “Performance Based Contracts in the Road Sector: Towards Improved Efficiency in the Management of Maintenance and Rehabilitation Brazil’s Experience,” The World Bank Group, Washinton DC, 2010.
[14] G. Liautaud, “Maintaining Roads: Experience with Out- put-Based Contracts in Argentina Chapter 4, Contracting for Public Services, Output-Based Aid and Its Applications,” The World Bank, Washington DC, 2001.
[15] G. J. Zietlow, “Implementing Performance-Based Road Management and Maintenance Contracts in Developing Countries, an Instrument of German Development Cooperation, Birmingham,” German Development Cooperation, Frankfurt, 2004.
[16] G. F. Segal, A. T. Moore and S. McCarthy, “Contracting for Road and Highway Maintenance,” Reason Foundation, Reason Public Policy Institute, Los Angeles, 2003.
[17] N. Ribreau, “Synopsis of WSDOT’s Review of Highway Maintenance ‘Outsourcing’ Experience, Transportation Research Board Committee A3C01 Maintenance and Operations Management,” Washington State Department of Transportation Maintenance and Operations, Washington DC, 2004.
[18] M. Frost, “Imperatives in Future Road System Management, Improved Road Maintenance Productivity—The Australian Case,” 14th IRF Road World Congress, Paris, 11-15 June 2001, pp. 1-20.
[19] P. Pakkala, “Innovative Project Delivery Methods for Infrastructure an International Perspective,” Finnish Road Enterprise, Helsinki, 2002.
[20] J. Zietsman, “Performance Measures for Performance Based Maintenance Contracts,” Texas Transportation Institute, Houston, 2004.
[21] C. Queiroz, “Options for Implementing Performance- Based Contracts,” Transport Forum, Washington DC, 2005.
[22] Austroads Inc., “Development of Performance Contracts and specifications - Full report, Opus International Consultants, New Zealand,” Austroads Inc., Sydney, 2003.
[23] W. A. Hyman, AASHTO and Federal Highway Administration, “Performance-based contracting for maintenance, A Synthesis of Highway Practice, NCHRP Synthesis 389,” Transportation Research Board, Washington DC, 2009.
[24] T. Hartwig, Y. Mumssen and A. Schliessler, “Output Based aid in Chad Using Performance-Based Contracts to Improve Road,” OBApproaches, Washington DC, 2005.
[25] The Daily Star, “Published Article on Padma Multipurpose Bridge Project on September 30, October 10, 15-17, 26, November 30, 2011,” The Daily Star, Dhaka, 2011.
[26] Transparency International Bangladesh, “Corruption in Public Sector Departments: Its Manifestations, Causes, and Suggested Remedies, a Report on the Findings of Four Diagnostic Studies on Corruption Conducted for the World Bank, Transparency International Bangladesh,” 2002. http://unpan1.un.org/intradoc/groups/public/documents/apcity/unpan004882.pdf
[27] Asian Development Bank, “Report and Recommendation of the President to the Board of Directors on a Proposed Loan to the People’s Republic of Bangladesh for the Road Network Improvement and Maintenance Project,” Asian Development Bank, Mandaluyong, 2002.
[28] Opus International Consultants Ltd., “Introducing Performance Based Maintenance Contracts to Indonesia Framework Document,” MWH Limited, Wellington, 2006.
[29] P. Robinson, “Road Maintenance by Contract—What are the Risks and Benefits?” International Congress on Local Government Engineering and Public Works: Incorporating 10th National Local Government Engineering Conference, Sydney, 22-26 August 1999, pp. 67-75.