JPEE  Vol.3 No.4 , April 2015
Conformance Test for IEDs Based on IEC 61850 Communication Protocol
ABSTRACT

In this paper, a conformance test platform is built for intelligent electronic devices (IEDs) from different manufacturers based on IEC 61850 communication protocol. A conformance test of time delay of message transmission between two IEDs, made by the same or different manufacturers, is performed. The conformance test platform, as well as the test results provide a helpful reference for IEC 61850 implementation.


Cite this paper
Yeh, T. , Hsu, S. , Chung, C. and Lin, M. (2015) Conformance Test for IEDs Based on IEC 61850 Communication Protocol. Journal of Power and Energy Engineering, 3, 289-296. doi: 10.4236/jpee.2015.34039.
References
[1]   Li, X.-B. and Han, M.-F. (2009) Analysis and Realization of GOOSE Real-Time Communication. Journal of Power System Protection and Control, 37.

[2]   Hung, Y.-L. (2010) Apply IEC 61850 Based IED to Smart Grid Protection. Master Thesis, National Taiwan University of Science and Technology.

[3]   Hakala-Ranta, A., Rintamaki, O. and Stark, J. (2009) Utilizing Possibilities of IEC61850 and GOOSE. CIRED 2009, Paper 0741.

[4]   IEC Standard 61850-5 (2013) Communication Requirements for Functions and Device Models, ed. 2.2.

[5]   Schimmel, R. and Xu, T. (2012) Test Procedures for GOOSE Performance According to IEC 61850-5 and IEC 61850-10. KEMA Nederland B.V.

[6]   Ke, Y.-K. (2013) The Study on GOOSE Functionalities of IEC 6180 Communication Protocol. Journal of Relay Association, 37, 33-41.

[7]   IEC Standard 61850-10 (2012) Conformance Testing, ed. 2.0.

[8]   Manassero Jr., G., Pellini, E.L., Senger, E.C. and Nakagomi, R.M. (2013) IEC61850-Based Systems-Functional Testing and Intero-perability Issues. IEEE Transactions on Industrial Informatics, 9, 1436-1444. http://dx.doi.org/10.1109/TII.2012.2217977

 
 
Top